Laserfiche WebLink
E. CONNECTION PEES <br /> Connection fees will be set for all user classes and adjusted from time to time by <br /> resolution of the City Council. <br /> A 3-1/2 percent administrative fee will be assessed on all connection fees. <br /> NOTE: Should connection to the City sewer system require a saddle tap to be <br /> made by City forces, there will be an additional charge of $210.00. If <br /> other than saddle tap connection must be made (i.e., Y connection), work <br /> done by City forces.will.be billed at cost plus standard overhead. <br /> 1/II. PRETREATMENT/SOURCE CONTROL PROGRAM <br /> Laborato[y Fees , <br /> General Analysis <br /> pH $ 8.09 <br /> Chloride (Cl), mg/L14:31 <br /> Biochemic Oxygen Demand, 5 days (BOD$), mg/L 32:32 <br /> Chemical,O en Demand .(COD,)., mg/L 32.32 <br /> Cyanide:Total, NT-), mg1L ,. 41.02 <br /> Cyanide Amenda e to Chlorination (CNA), Mg/,L". 68.38 <br /> Oil and Grease (O/ , mg/L 32.32 <br /> Total.:Suspended, Soli (TSS), mg/L 14.31 <br /> Settleable,-Solids, ml/L 8.09 <br /> Total Dissolved Solids (TD ~, mg/L 14.31 <br /> B. Metal Analysis <br /> Sarxmple Preparation <br /> Aqueous (includes pH) $22.38 <br /> Sludge or;,Soil 27.36 <br /> Aluminum, mg/L 24,86 <br /> Arsenic, mg/L :41.02 <br /> Cadmium;mg/L 16;79 <br /> Chrgmigrn;Total mg/L 16.79 <br /> Copper;. 9/L,,.. 16.79 . <br /> lran,;mglL <br /> 16.79 <br /> Lead; mglL 1.G.7 . <br /> Mercury 4°3'.5 e I <br /> Nickel, mg/L 16,79 <br /> Selenium, mg/L 1.02 <br /> Silver, mg/L 1 79 <br /> Zinc, mg/L. 16. <br /> -10- <br /> 0 ,, 0 <br />