KEALTHAND 5ANITAT70MCOD€
<br /> 5. Permit Transfer. C;-charge 3. Industrial users shall notify the POTW prior
<br /> Permits are issued to a s, ;0 r ir=:er far a specific to releasing any discharge which differs from the
<br /> I operation. A Wastewater Discharge Permit shall not terms of the permit in measurable amounts with
<br /> be reassigned, transferred, or sold to a new owner, regard to the volume or character of pollutants
<br /> new user, different premises, or a new or changed contained in the discharge, including hazardous
<br /> operation, and shall not extend to an increase in wastes. In addition, all users shall immediately notify
<br /> usage, discharge, or operations by an existing user the POTW and the appropriate local, State, and
<br /> without the approval of the City. Any succeeding Federal agencies of any discharge which would be
<br /> owner or user shall apply for a Wastewater considered a hazardous waste if disposed of in a
<br /> Discharge Permit thirty (30) days prior to change of different manner. Anv verbal notice given to the
<br /> ownership and shall also comply with the terms and POTW as required by this part shall be followed by
<br /> conditions of the existing permit until a new permit is a written report of the particulars of each such
<br /> issued. incident %, tfiin fifteen (15) days after the user
<br /> 6. Users(including Significant Industrial Users). becomes aware or should have become aware of
<br /> In addition to the provisions set forth above, the discharge. In addition, all industrial users shall
<br /> regarding the duration and transferability of permits, promptly notify the POTW in advance of any
<br /> permits issued to users shall specify, in detail, the substantial change in the volume or character of
<br /> requirements for self-monitoring,sampling, reporting, pollutants in their discharge.
<br /> notification, and record keeping; the applicable 4. Where sampling by a user, conducted
<br /> Federal,State,and local effluent limitations;and the pursuant to this Section, indicates a violation, the
<br /> administrative,civil,and criminal penalties which may user shall notify the POTW within twenty-four (24)
<br /> be pursued in cases of noncompliance_ hours of becoming aware of the violation. Within
<br /> (Amended by Ordinance 013-93C.S. — Effective thirty (30) days of discovering the violation,the user
<br /> June 10, 1993) (Added by Ordinance 3690C.S. --- shall resample and submit a report of the results of
<br /> Effective Oct. 13, 1993) the resampling to the POTW. The industrial user is
<br /> not required to resample if the POTW performs
<br /> SEC 7-090.3. REPORTING AND MONITORiNG monitoring at the industrial user's facility at least once
<br /> REQUIREMENTS: a month or if the POTW performs sampling between
<br /> 1. The Director shall require users to submit the industrial user's initial sampling and when the
<br /> periodic monitoring and compliance reports. Such industrial user receives the results of the initial
<br /> reports may consist of baseline monitoring reports, sampling.
<br /> compliance schedule reports, reports on compliance (Amended by Ordinance 013-93C.S. — Effective
<br /> with categorical deadlines, periodic reports from June 10, 1993) (Added by Ordinance 3690C.S. —
<br /> categorical users, and periodic compliance reports Effective Oct. 13, 1983)
<br /> from significant noncategorical users, and, at a
<br /> minimum, shall comply with the reporting- _. .. SEC.7-090.4. - MONITORING FACILMES: -
<br /> requirements set forth in 40 CFR 403.12. In addition, The City may require, at the user's expense,
<br /> users, industrial users,or significant industrial users monitoring facilities to allow inspection, sampling,
<br /> subject to national pretreatment standards shall and flow measurement of the building sewer and/or
<br /> comply with all requirements governing those internal drainage systems. The monitoring facility
<br /> standards. should normally be situated on the user's premises,
<br /> 2. All reports and documentation required to be but the City may, when such a location would be
<br /> submitted pursuantto this Section shall be signed by impractical or cause undue hardship on the user,
<br /> the appropriate officials and representatives of the allow the facility to be constructed in the public street
<br /> industrial user or significant noncategorical user and or sidewalk area and located so that it may not be
<br /> shall contain a certification statement as that obstructed by landscaping or panted vehicles.
<br /> required by 40 CFR 403.6(a)(2)(ii)which shall attest There shall be ample room in or near such
<br /> to the integrity of the analytical data submitted, sampling manhole or facility to allow accurate
<br /> Furthermore, all such users must keep records of sampling and preparation of samples for analysis.
<br /> monitoring activities and results for a minimum of The facility, sampling and measuring equipment
<br /> three (3)years, or longer in the case of unresolved shall be maintained at all times in a safe and proper
<br /> litigation or when requested to do so by the Approval operating condition at the expense of the user.
<br /> Authority. Whether constructed on public or private
<br /> property,the sampling and monitoring facilities shall
<br /> 7-37
<br />
|