Laserfiche WebLink
Peters Enterprises -2- <br /> investig4tive workplan/Corrective Action Plan(CAP)before performing any work. This phasing <br /> process and the workplan/CAP requirements were intended to: <br /> L help the responsible party undertake the necessary corrective action in a cost-effective,efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health,safety and <br /> the environment. <br /> In some limited situations interne chump will be necessary to mitigate a demonstrated,immediate <br /> hazard to public health,or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action,and; (2) <br /> complying with any requirements that the regulatory agency may set. interim remedial action should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval• Only corrective action costs required by the regulatory agency to <br /> protect human health,safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids and cost preapprova4 reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact Sandy Gill at(916)227-441 L <br /> Sincerely, <br /> Dave Deaner,Manager <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr.Gordon Boggs Ms.Margaret Lagorio <br /> RWQCB,Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento,CA 95827-3098 Stockton,CA 95201 <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />