My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2081
>
3500 - Local Oversight Program
>
PR0544590
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:50:58 PM
Creation date
6/21/2019 10:58:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544590
PE
3528
FACILITY_ID
FA0003932
FACILITY_NAME
KWIKEE FOODS
STREET_NUMBER
2081
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12315225
CURRENT_STATUS
02
SITE_LOCATION
2081 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ftlol <br /> Peters Enterprises -2- January 28, 2000 <br /> Table 1 <br /> REASONABLE COS-'BREAKDOWN <br /> Task Reasonable Cost,$ Comments/Changes <br /> 1. Work plan addendum $313 Proposed cost is reduced by costs for workplan preparation. <br /> Tasks had been completed.Cost only includes permitting. <br /> 2A. Labor(drill 4 monitor $1069.50 One hour of regulatory liaison and one hour of secretarial& <br /> wells) accounting is determined reasonable. <br /> 213.Equipment&misc $168 Proposed cost is reduced by company equipment rental costs. <br /> These costs are considered ancillary costs&are not <br /> reimbursable by the Fund unless supported by 3 bids and/or <br /> determined reasonable. <br /> 2C. Subcontracted services $4997.40 Includes driller and lab analyses.Reasonable cost for <br /> oxygenates analysis is$130/sample and for gasBTEX is <br /> $60/sample including disposal. <br /> 3A. Groundwater $6208 Eight hours of travel time,22 hours of sampling time @ 55/hr, 8 <br /> monitoring&reporting hours of CAD drafting&2 hours of regulatory liaison is <br /> 4quarters) determined reasonable. <br /> 313. Equipment& $848 Proposed cost is reduced by company equipment rental costs. <br /> miscellaneous See comment on item 213.Reasonable cost for drums is <br /> $35/drum. <br /> 3C. Subcontracted services $5320 Lab analyses. See comment on item 2C. <br /> 4.UST Fund reimbursement 0 Only corrective action costs are included in the pre-approval. <br /> package preparation <br /> TOTAL Reasonable Cost $18,923.90 <br /> Should you decide to obtain the additional bids for satisfying the three-bid requirement, and if you so <br /> elect,the legislation governing the Fund allows Fund staff to assist you in procuring contractor and <br /> consultant services for corrective action. If you need assistance in contracting for corrective action <br /> Se <br /> rvices or any other matter, don't hesitate to call me at (916) 227-4518. <br /> Sincerely, <br /> WennilWater esources Control Engineer <br /> yn <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: %Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.