Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> REMARKS AND SIGNATURES <br /> 1.0 INTRODUCTION 1 <br /> 2.0 BACKGROUND INFORMATION 1 <br /> 3.0 PROBLEM ASSESSMENT 2 <br /> 3.1 Phase l—Groundwater Flow Direction 2 <br /> 3.1.1 Assessment Procedures and Results 2 <br /> 3.2 Phase 2—Soil Contamination 3 <br /> 3.2.1 Tank Removal Results 3 <br /> 3.2.2 Installation of Soil Borings 3 <br /> 3.3 Phase 3—Groundwater Contamination 4 <br /> 4.0 SITE CHARACTERIZATION 5 <br /> 4.1 Site Hydrogeoiogy 5 <br /> 4.1.1 Stratigraphy 5 <br /> 4.1.2 Depth to Groundwater 6 <br /> 4.1.3 Groundwater Flow Direction 6 <br /> 4.2 Extent of Soil Contamination 6 <br /> 4.3 Extent and Volume of Contaminated Groundwater 6 <br /> 5.0 RECOMI ENDATIONS 7 <br /> TABLES <br /> Table 1 Depth to Groundwater <br /> Table 2 Analytical Results--'Soil <br /> Table 3 Analytical Results--Groundwater <br /> Table 4 Analytical Results--Tank Removal <br /> FIGURES <br /> Figure 1 Location Map <br /> Figure 2 Site Plan <br /> Figure 3 TPH-g and Benzene in Soil, 15-20 Feet <br /> Figure 4 Depth to Groundwater vs Time <br /> Figure 5 Groundwater Flow Direction, 1994-2001 <br /> Figure 6 Cross Section A-A' <br /> Figure 7 Isocontours of TPH-g and Benzene in Groundwater,May 2000 <br /> Figure 8 TPH-g Concentrations in KF-3 and MW-6 vs Time <br /> APPENDICES <br /> Appendix A Boring Logs <br />