Laserfiche WebLink
~ 98STOCK3.EST <br /> SUMMARY REMEDIAI1*aT PfiE1F'C?$ € FORM — t <br /> Terra Vac Project #:30-0212 _— -- <br /> _ <br /> Former Chevron Station 9-4054 — — — — <br /> 2103 Country Club Road -- — —� <br /> Stockton, California _ Total project cost $221,886 <br /> Chevron POC Brett Hunter <br /> Labor"Rates arsd €rlformaiiarr S99Vehicle $75 <br /> Project Manager $50 <br /> Supervising Engineer 5137 Phone _. <br /> Chemist $72 Per Diem 5100 <br /> Senior Geologist $93 <br /> Geologist $73 <br /> Engineer $78 <br /> Technician $50 <br /> Mark-up -- 1.15 <br /> Fixedr r! Task Phase <br /> . <br /> z9r.,ay.Osh9<'a.'<e.hio-c£;... ... ... {y Total SU total <br /> A OXY < j b >O nOJOi" . W.A P M}).v�. � <br /> TASK 1: Work Plan & Regulatory Negotiation <br /> Subtask 1: Complete File Review 10 $99 $990 <br /> Subtask 2: Regulatory Negotiation 40 $99 $3,960 <br /> Subtask 3. Remediation Work Plan 10 $73 $730 <br /> Subtask 4: Meetings with RP 0 5 $99 $495 <br /> Subtask 5: Meetings with Regulators 0 20 $99 $f,980 <br /> ODC $0 <br /> TOTAL TASK 1 $8,155 <br /> TASK 2: Engineering, Permitting, Reporting <br /> Subtask 1: Additional File & Data Review 5 $99 $495 <br /> Subtask 2: Remediation System Design $2,574 <br /> calculation of extent of hydrocarbons 1 $78 $78 <br /> preparation of project schedule 1 $78 $78 <br /> utility design 20 $78 $1,560 _ <br /> construction bid specs. 8 $78 $624 <br /> drafting 3. $78 ___$234 <br /> Subtask 3: Permitting $4,788 <br /> Building 2003 $78 $434 — <br /> Electrical 100 2 $78 $256 <br /> Air 100 8 $72 $685 <br /> Water 30 $73 $2,190 _ <br /> Well/ Boring 89 10 $73 $827 <br /> Permit Review 4 $99 $396 <br /> Subtask 4: Health & Safety Plan 4 $73 5292 $292 <br />