My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:38:17 PM
Creation date
6/21/2019 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron "a l zd X48 c <br /> Chevron U.S.A. Products Company SEP 1 D 1992 <br /> QO 2410 Camino Ramon,San Ramon,Caftmia•Phone(510) 842-9500 ENVIRONMENTAL HEALTH <br /> Mail Address: P.O.Box 5004,San Ramon,CA 94583-0804 PERMIT/ft"V100 <br /> September 8, 1992 <br /> Mr. Michael Infurna <br /> San Joaquin County Public Health Services <br /> P.O. Box 2009 <br /> 1601 East Hazelton Avenue <br /> Stockton, CA 95201 <br /> Re: Former Chevron Service Station #94054 <br /> 2103 Country Club Blvd., Stockton <br /> Dear Mr. Infurna: <br /> Enclosed we are forwarding the Work Plan for Soil Assessment dated September 1, 1992, <br /> prepared by our consultant Groundwater Technology, Inc. for the above referenced site. This <br /> work plan proposes to install eight (8) soil borings in the vicinity of the former underground <br /> storage tanks and associated piping to delineate the vertical and horizontal extent of the <br /> hydrocarbon-affected soils. These borings will be installed in conjunction with the installation of <br /> the additional monitor wells proposed in my letter dated August 26, 1992. <br /> We would appreciate your review and formal concurrence to this work plan. We have tentatively <br /> scheduled the work to commence on September 17, 1992, pending encroachment permit <br /> approval. If you have any questions or comments, please do not hesitate to contact me at(510) <br /> 842-9581. <br /> r <br /> uly you , <br /> (�N-U. A. P p CTS COMPANY <br /> elich <br /> Site Asse ment and Remediation Engineer <br /> Enclosures <br /> cc: Mr. Gordon Boggs, RWQCB-Central Valley <br /> Mr. J. Lawrence Pearson, RWQCB-Central Valley <br /> Ms. Sandra Lindsey, GTI-Concord <br /> Ms. L.B. Williams, 555/4023 <br /> Mr. J.N. Robbins, Chevron Park/V1156 <br /> Mr. Richard Macey <br /> Macey &Brisco <br /> 4609 Quail Lakes Drive, Suite 4 <br /> Stockton, CA 95207 <br /> File(9-4054W2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.