My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:34:54 PM
Creation date
6/21/2019 1:11:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John M.Parker-Blvd. Auto Service -2- November 10, 1998 <br /> If you do not request review and reconsideration by the Program Manager or request a Final Division <br /> Decision from the Chief of the Division within sixty(60)calendar days from the date of this letter, the <br /> Staff Decision will then become final and conclusive. <br /> Compliance Review: After adoption of the Priority List, staff will review, verify,and process <br /> applications based on their priority and rank within a priority class. During this Compliance Review, <br /> staff may request additional information needed to verify eligibility. Once review of the application is <br /> complete and the claim is determined to be valid,a Letter of Commitment will be issued obligating funds <br /> toward the cleanup. After the compliance review,your claim may be rejected if Division staff determine <br /> that you have not complied with regulations governing site cleanup,you have not supplied necessary <br /> information or documentation, or your claim application contains a material error. In such event, you <br /> will be issued a Notice of Intended Removal from the Priority List, informed of the basis for the <br /> proposed removal of your claim, and provided an opportunity to correct the condition that is the basis for <br /> the proposed removal. Your claim will be barred from further participation in the Fund,however,if the <br /> claim application contains a material error resulting from fraud or intentional or negligent <br /> misrepresentation. <br /> Record keeping: During your cleanup project you should keep complete and well organized records of <br /> all corrective action activity and payment transactions. If you are eventually issued a Letter of <br /> Commitment, you will be required to submit: (1)copies of detailed invoices for all corrective action <br /> activity performed(including subcontractor invoices),(2)copies of canceled checks used to pay for work <br /> shown on the invoices, (3) copies of technical documents (bids,narrative work description,reports),and <br /> (4)evidence that the claimant paid for the work performed(not paid by another party). These documents <br /> are necessary for reimbursement and failure to submit them could impact the amount of reimbursement <br /> made by the Fund. It is not necessary to submit these documents at this time; however, they will <br /> definitely be required prior to reimbursement. <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991, you must have complied with corrective action requirements of <br /> Article 11,Chapter 16, Division 3, Title 23, California Code of Regulations. Article 11 categorized the <br /> corrective action process into phases. In addition,Article 11 requires the responsible party to submit an <br /> investigative workplan/Corrective Action Plan (CAP)before performing any work. This phasing <br /> process and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective,efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to <br /> undertake interim remedial action after: (1)notifying the regulatory agency of the proposed action,and; <br /> (2) complying with any requirements that the regulatory agency may set. Interim remedial action should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.