Laserfiche WebLink
. , NZ lro!"i <br /> uJ; . <br /> File Edit Co To Favorites Help <br /> Ad search Favorites <br /> Address Ff¢s:,f,io r e L.r omtert d.F� 3u fe ij unloadsiyeo_reportf 17973149 TOoO OOD30 FDF Go Links " <br /> 18 August 2008 '1 <br /> AGE-NC Project No.96-0236 <br /> page 7 of 7 <br /> for full delineation of the hydrocarbon impact to ground water. <br /> • Implementation of interim ground water pomp-and-treat remediation at the site to establish <br /> hydraulic control and inhibit continued off-site migration ofthe contaminated ground water <br /> Plume. <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultands practicing in this or similar localities.The findings were based mainly <br /> upon analytical results provided by an independent laboratory. Evaluations of the hydrogeologie <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points(e.g.ground water samples),and subsurface conditions may varythrougb time <br /> or with distance from these data points. No other warranty,expressed or implied,is made as to the <br /> - � ..___-. <br /> UnWrown Zone o- <br /> !0 Internet i <br /> f Start +_J Inbox-Microsoft Outlook ' ::.'welcome to GeoTraoker ( -_https:ffgeotracker.... J/ MkmsoFt Word ?'IlEnvisbn _� «�' 3:17 PM <br />