Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: Neshemat, Lana <LNeshemat@buckeye.com> <br /> Sent: Wednesday,June 19,2019 10:22 AM <br /> To: Ruvalcaba,Cesar <br /> Cc: Bird,James, Leiker, Dennis <br /> Subject: FW: Inspection list <br /> Lana, <br /> Below is truncated list for Stockton only. <br /> Tank 7 and 9 on this list are small enough diameter to qualify for STI inspections instead of API 653 inspections. <br /> STI does not require tanks taken OOS for inspections and our SPCC plan (annex A) allows for either API or STI <br /> inspections. <br /> Tank Next In-Service <br /> Location Name Tank Type Next COS 653 Inspection <br /> Stockton Terminal(BETKU) 1 VFRT 12/31/2018 <br /> Stockton Terminal(BETKU) 10 VFRT <br /> Stockton Terminal(BETKU) 2 IFRT 12/19/2023 8/13/2019 <br /> Stockton Terminal(BETKU) 3 IFRT 4/18/2038 4/18/2023 <br /> Stockton Terminal(BETKU) 4 IFRT 8/25/2019 8/13/2019 <br /> Stockton Terminal(BETKU) 5 VFRT 10/10/2033 10/10/2018 <br /> Stockton Terminal(BETKU) 6 IFRT 9/16/2019 8/13/2019 <br /> Stockton Terminal(BETKU) 7 VFRT 12/2/2029 <br /> Stockton Terminal(BETKU) 8 EFRT 10/17/2027 8/10/2022 <br /> Stockton Terminal(BETKU) 9 HT 6/21/2032 <br /> Stockton Terminal(BETKU) Sump S2 10/5/2032 <br /> V/R, <br /> David L.Clark,P.E. <br /> Senior Project Manager <br /> Buckeye Partners,L.P. <br /> 12920 Bell Road <br /> Lemont, IL 60439 <br /> (w) 331-803-3708 <br /> (c)219-240-5467 <br /> 1 <br />