My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
FIELD DOCUMENTS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:42:38 PM
Creation date
6/21/2019 1:19:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 July 2012 <br /> AGE-NC Project No.96-0236 <br /> Page 6 of 13 <br /> 387.5%; <br /> • ORP ranged from -83.0 (MW-2) to 517.0 mV (DPE-1); <br /> • Salinity ranged from 0.43 (DPE-2) to 2.68 (DPE-1); and <br /> • TDS ranged from 0.862 g/I (DPE-2) to 3.236 g/I (DPE-1). <br /> 4.1.4. Post-ISCO Injections Monitoring Event No. 3 <br /> On 09 May 2012, ISCO field parameters as described in section 3.3 were collected from <br /> wells MW-1A, MW-2, MW-4, DPE-1 and DPE-2 as part of post-ISCO injection ground <br /> water monitoring (Table 2). The following is a summary of the results: <br /> • Depth to ground water measurements ranged between 8.35 feet(DPE-1) btoc and <br /> 8.83 feet (DPE-2) btoc; <br /> • pH ranged from 1.76 (MW-1A) to 5.54 (MW-4); <br /> • SC ranged from 1,018 pS/cm (DPE-2) to 3,827 pS/cm (DPE-1); <br /> • Temperature ranged from 19.9 °C (MW-4) to 24.1 nC (DPE-2); <br /> • DO ranged from 1.32 mg/I (MW-4)to 9.84 mg/1 (DPE-2)and from 14.5%to 117.8%; <br /> • ORP ranged from -7.2 (MW-1 A) to 228.1 mV (DPE-1); <br /> • Salinity ranged from 0.51 (DPE-2) to 2.15 (DPE-1); and <br /> • TDS ranged from 0.672 g/I (DPE-2) to 2.639 g/I (DPE-1). <br /> 4.1.5. Post-ISCO Injections Monitoring Event No. 4 <br /> On 16 May 2012 field parameters were collected from wells MW-1A, MW-2, MW-4, DPE-1 <br /> and DPE-2 as part of post-ISCO injection groundwater monitoring (Table 2).The following <br /> is a summary of the results: <br /> • Depth to groundwater measurements ranged between 8.54 feet(DPE-1) btoc and <br /> 9.35 feet (MW-4) btoc; <br /> • pH ranged from 2.88 (DPE-1) to 6.69 (MW-2); <br /> • SC ranged from 1,210 pS/cm (DPE-2) to 3,204 pS/cm (DPE-1); <br /> Advanced GeoEnvironmentai„Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.