My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:50:49 PM
Creation date
6/21/2019 1:20:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOULEVARD AUTOMOTIP' Page 1 of 2 <br /> u 1400 <br /> Path to Closure Plan s GoG90TRAGI HOME IMANAGE PRUE I REPORTS IIE680ILQUM <br /> BOULEVARD AUTOMOTIVE(70607700030)-MAP THIS SITE OPEN-ASSESSMENT&IMERIMREMEDIAL ACTION <br /> 2151 COUNTRY CLUB BLVD ACTIVITIES REPORT CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON,CA 95204 SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:2424 <br /> SAN JOAQUIN COUNTY PUBLIC BPA E CASEWORKER:ANGELICA SANOOVAL MARIN-SUPERVISOR:ADRIENNE EU-SAESSER <br /> CASEWORI(ER:ANGR fca,SaNCOVAL MARIN-SURERMSOR;ADRIENNE ELLSAESSER <br /> VIFW PRINTABLE CAS MM FOR THIS SITE CENTRAL VALLEY RWOCB(REGION 5S)-CASE#'390044 <br /> CASEWORKER:JAMES BARTON-SUpERNSOR:CORI CONLON <br /> CUFCMima:12962 CUP Priority Assigned:0 CUP Amount Paid:W53M <br /> THIS PROJECT WAS LAST MODIFIED BY NUEL NENDERSON ON 582014 351:24 PM-HISTORY <br /> THS SITE HAS SUBMITTALS.CUM it=TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE <br /> Path to Closure Plan THIS VERSION IS FINAL AS OF SAM2014 PATH W CLOSURE HISTORY 1. TOCILDSURSPLAN <br /> IMPEDIMENT 1: <br /> General Crtteria D:Free product has NOT been removed to the maximum extent practicable r Procedural Impediment-IM <br /> Stap to Rasolw Impeffinsart 1-Sb 1:-XLEMME COMPLETION DATE <br /> Prepare and submit a report on free product occurrence, removal methods and quantities to date, and <br /> proposal for completing free product removal. ROJECTED DIUE ACTUAL <br /> 9l302014 <br /> goar to Resolve Impediment I-Ste2:-DELEMACTEP COMPLETION DATE <br /> Complete flee protluct removal. <br /> PR OA <br /> N30I2015 <br /> AM ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria E:A conceptual site model that assesses the nature,extent,and mobility of Ne release C.F_ Procedural Impediment-INFO <br /> has NOT been developed -- - <br /> Step to R.I.Inipealknent2 SIA 1:-OJELIME Snar COMPLETION DATE <br /> Prepare and eubmit xork plan to complete plume delineation. - <br /> P0.0JECTEDDATE ACTUALS <br /> 9TOI iU11 <br /> Sd to Resdw lm inHnt2 Ste 2:- COMPLETION DATE <br /> Complet pl a deli...t' n antl upd,r onceptual t model, <br /> PROJECg1TED DATE T LOATE <br /> JpU15 �-� <br /> ADDADomI3NAL STEP <br /> IMPEDIMENT 3: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable �'� F_ Arocedu raI lmped invent-INro <br /> S to Resolva Inv ImeM 3 Ste i. P <br /> COMPLETION DATE <br /> Prepare and <br /> submit corrective action plan (CAP) <br /> J PROJECTED0014 DATE_ ACTUAL DATE <br /> Jl30 1,172,11 <br /> Ste to Resolve lanselinsamta Ste 2:- '"I <br /> Com late blit ti iron fon CAP 1. COMPLETION DATE .JJ <br /> p po par pa approval. <br /> PROJECTED DAT ACTUAL DATE <br /> ..9I3N2014 I r <br /> Step to Resolve Impediment 3-Ste 3..DELEMIM1 --- <br /> implement approved CAP and complete tractive action. COMPLETION DATE <br /> PROJECTE DATE ACNAL DATE <br /> 9/30/2015 �— <br /> I <br /> Step to Resolve Impediment 3-Ste 4:-2LLLTE STEP '- - <br /> COMPLETION DATE <br /> Contluct verification sampling and/or monitoring a necessary [o demonstrate adequate reduction of <br /> ontaminant mass and concentrations to pass LTCP criteria. PR D I��g <br /> c 6/362016 <br /> --._. .__ <br /> —. — ADDADDITIONALSTEP <br /> IMPEDIMENT 4: _ <br /> Media-Specific Criteria:Groundwater.The contaminant plume that exceeds water quality objectives is fl Procedural Impediment-j= <br /> NOT stable or decreasing in areal extent,and does NOT meet all of the additional characteristics of one of <br /> the five classes of saes. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):a 260 Feet and<1,000 Feet <br /> • Free Product in Groundwater:Yes <br /> • Free Product Has Been Removed to the Maximum Extent Practicable:No <br /> • For sites with free product the Plume Has Been Stable or Decreasing for 6-Years(Info):Unknown <br /> • For sites with free product owner Willing to Accept a Land Use Restriction(if required):Unknown <br /> • Benzene Concentration:a 3,000 pg/l <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_lolicy.asp?global_id=T06... 5/8/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.