Laserfiche WebLink
BOULEVARD AUTOMOTIu <br /> Page 2 of 2 <br /> Prepere and submit Ca[rec[iVe action plan ICAPI <br /> COMPLETION DATE <br /> PR TF e�.r,1•..,-A <br /> Map to R••ilw aDwalm.m4-sa z:- - -s/Ja/zo14 I <br /> v s <br /> Complete public participation for CAP approval. <br /> COMPLETION DATE <br /> PROJE <br /> — ' —Ts ACTU AL Op E <br /> Step to Resolve Impediments.Sts,J:- TE SIE <br /> Implement approved CAP and complete coaec[ive action. <br /> COMPLETION DATE <br /> P OJ C D rpCTUp nem <br /> 9/30/2015 1 — <br /> SfeptoResolvelmPetlimentC- � - - --- - - <br /> Step 4:- L a P <br /> Contluc[ verificaCion sa.p in= and monit0['rn <br /> n <br /> ontaminant mass and con en[ ations to gas :easy to demonstrate adeq.[e reduction of COMPLETION DAZE <br /> pees LTCPc[it[ia. r A�CTUp`p?•TE <br /> A F T p <br /> IMPEDIMENTS' <br /> Media Specific Criteria:Petroleum V Intrusion to indoor Air:The site is NOT considered IOW-threat for <br /> the apor Intrusion-tore"pathway and site-specific conditions do NOT satisfy Items 2a,2b,or 2c. Procetlural Impediment-INro <br /> ----------------- <br /> Conditions that do not meet the policy criteria: <br /> • Free Product:In Groundwater <br /> • Sioattenuation Zone Thickness:Z 5 Feet and<10 Feet <br /> • 02 Data in Bioattenuation Zone:No OP Data <br /> • Benzene in Groundwater:Z 1,000 pg/I <br /> • Soil Gas Benzene:Unknown <br /> • Soil Gas EthylBenzene:Unknown <br /> • <br /> Soil Gas Naphthalene:Unknown <br /> S PaR O.Impediment5-8ap1:-DELETESTEP <br /> F-777p1--- required to complete Plome delineation should also address data neetls for evaluating the vapor COMPLETION DAIS <br /> intrielon hazard/risk. <br /> PRO CTE TE <br /> _ _.. 4/152014.. ._.'.. 1 ; <br /> 8apala•olampolm•nt 5-Sbp f:- _- .. ..._.. ___ ._._. <br /> Contluct such additional site assessment as needed to evaluate vapor rntrusron and submit aport of COMPLETION DATE <br /> findings. PROJECTED DATE I��pC <br /> 9/158014 1 <br /> Sap to Woly Impediment 5-Step J:-DELETE STEP <br /> GP should include any necessary actions to address VI issue and he part of the implemented corrective COMPLETION DATE <br /> action. P O O I�nC�wL DAM <br /> 9/308015 I ' <br /> ADDADDITIONALSTEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> DATE IDENTIFIED RP NOTIFICATION PARTICIPATION DESTRUCTION WASTE DISPOSAL USE SITE CLOSURE <br /> FORFOR C CLOSURENITIAMD BY DATE COMPLETION DATE DAM RESTRICTION DATE DAM'Dia Identified fir LlOauR lS the dhth,.l impediments to closure have been removed IIS II — II� <br /> Save in Progress Save as Final <br /> LOGGED IN As HENDERSONN CONTACT <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure policy.asp?global id=T... 11/20/2013 <br />