Laserfiche WebLink
CAMBRIA <br /> Schedule <br /> After receiving work plan approval from EHD, Cambna will apply for the drilling permit and <br /> schedule the field work EHD will then be notified of the field schedule <br /> If you have any questions regarding the scope of work outlined to this work plan, please call Joe <br /> Neely at (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> 0 <br /> Joe W Neely, RG �,O g��� W �F Ci <br /> Senior Project Geologist sa <br /> RG 6927 <br /> ` No 6927 � <br /> Attachments OF Cpd�EO� <br /> Figure 1 Site Vicamty1Well Survey Map <br /> Figure 2 Site Plan/Proposed Well Location Map <br /> cc Ms Karen Petryna, Shell Oil Products US <br /> Mr James Barton, Central Valley Regional Water Quality Control Board <br /> Mr Dennis Johnson, Shell Oil Products US <br /> 0783 4 <br />