Laserfiche WebLink
SHELL N ELL MONITORING DATA SHEET <br /> Project#: gSol Z 4--S1 WIC #: zo y <br /> — 75Zgf 3s,oS <br /> Sam ler: DoU G- Date: 1—2-19 <br /> 19 <br /> Well l.D.: (2qwg) LicleW74A Well Diameter: 2 3 4 6 g 5 tr <br /> Total Well Depth: — Depth to Water: 13. !LI <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Pvc Grade D.0 Meter (if req'd): Ysl HACH <br /> Wgj1 Djamr4e yujilmher Well Almeier Multiplier <br /> 2" 016 5" 102 <br /> 3" 037 6" 147 <br /> 4" 065 Other rad]us2 a 0163 <br /> Purge Method Bader Samphng Method Bailer <br /> Middleburg Extraction Port <br /> Electric SubmersibleOther <br /> Extraction Pump <br /> Ocher S.s.i <br /> X = Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond Turbidity Gals Removed Observanons <br /> Pow holes Sq <br /> Did well dewater? Yes GO) Gallons actually evacuated: <br /> Ur— t'o�F $as � <br /> Sampling Tune: W_ Down CC 6 to Sampling Date- 19 <br /> Sample T.D.: w- f of t- <br /> P W - P*Wi , Laboratory: sequoi Crosby <br /> Analyzed for: TPIi- TPH-D G� O-cyge-w�e,t by $zbo ,t- .1e+ha-,a1 <br /> Equipment Blank T.D.: Ea @ Tm. Z 2-0 Duplicate I.D.: <br /> Analyzed for: Px- TPH-D ter <br /> D.O. (if req'd): Pre-purge ye/ Post-purge / <br />