Laserfiche WebLink
Page 3 of 3 <br /> if you send ONE LARGE check be advised if I can't issue ALL permits due to some <br /> problem, then I can't issue ANY.. I recommend you send a check with each application if <br /> i possible. I have very limited time in the office with s00000 many well destructions. <br /> working on four applies at a time is quite time consuming. not always possible for me. <br /> but one at a time, here and there is the best. <br /> mike <br /> From: Scott Bittinger[mailto:sbittinger@stratusinc.net] <br /> Sent: Wednesday, September 14, 20114:03 PM <br /> To: Mike Infurna [EH] <br /> Subject: 2705 Country Club Boulevard <br /> Mike: <br /> I just wanted to give you an update regarding the project. <br /> Chuck Miller of Palisades/USA has given us the go-ahead for destroying all of the wells at this site. <br /> A few days ago,encroachment permit applications were submitted to Cal Trans and the City of <br /> Stockton. Once approved,well destruction permit applications will be sent to your attention. <br /> have attached a table showing the well construction details for the site and the method of <br /> destruction that we are proposing. Essentially,the shallow wells that are impacted are proposed for <br /> overdrilling,and the shallow wells that are clean are proposed for pressure grouting. All lower zone <br /> wells (historically clean, but sampling discontinued for last event)are proposed for pressure <br /> grouting. <br /> When you get a chance, please take a look at this& let me know if our plan of attack is acceptable <br /> to you. We'll use this information to bid the job out&select a contractor. <br /> Before implementing the project,will you need a formal work plan, or is simply designating the <br /> methodology(ie pressure grout vs.overdrill)sufficient for you? <br /> Scott Bittinger <br /> 9/15/2011 <br />