Laserfiche WebLink
UNDERGROUND STORAGE TANK UNAUTHORIZED RELEASE (LEAK)/CONTAMINATION SITE REPORT <br /> EMERGENCY HAS STATE OFFK)E OF EMERGENCY SER ICES FOR LOCALAGENCY USE ONLY <br /> REPORT BEEN FILED 7 :JHE- BY.CEATIFYTHAT.:1_HAVE DI �U DTHIS INF MATION'ACCORDING TO❑ YES NO ❑ YES NO <br /> TK7N <br /> Ni W UC NS HEEP E SACK PAGE OF. IS <br /> REPORT GATE CASE -71 <br /> O -1 u1 r NFD DA <br /> NAME OF INOIY UAL FILING ktPORT PHONE SIGMA RE <br /> t7i(l <br /> rm 'j) �� ` <br /> REPRE TING ❑ OWNERIOPERATOR ❑ REGIONAL BOARD <br /> p LOCAL AGENCY ❑ OTHER �J C ' <br /> i <br /> a <br /> ADDRESS cj <br /> STREET CTTr STATE C4,2, / <br /> w <br /> NAMEP ONE <br /> Z ❑ LINK <br /> NOWN <br /> O <br /> a <br /> o_ ADDRESS <br /> � <br /> w <br /> Q O/ -2&/co STATE <br /> 5T <br /> FAITV NAME(IF APPLICABLE) OPERATOR PHONE <br /> a ADDRESS <br /> U <br /> O <br /> J <br /> W <br /> CROSS STREET <br /> O LOCAL GENCY AGENCY NAME CONTACT PERSON PHONE <br /> z <br /> w� ��- -3 s <br /> w w DN <br /> RE NAL BOARD �EIY <br /> �a <br /> U) ( ) JAME QUANTITY LOST(GALLON <br /> w O <br /> C N 5( �2/�Z y <br /> UNKNOWN <br /> r- <br /> m (2) <br /> z_ <br /> N ❑ UNKNOWN <br /> z DATE DISCOVERED HOW DISCOVERED ❑ I DRY CONTROL F-1SUBSURFACEMONITORING ❑ NUISANCE CONDITIONS <br /> w I mio r Y ❑ TANK TEST TANK REMOVAL Q OTHER <br /> < DATE DiSCHARbF BEbAN METHOD USED TO STOP DISCHAR (CHECK ALL THAT APPLY) <br /> m <br /> CZ <br /> UNKNOWN ❑REMOVE CONTENTS CLOSE TANK d REMOVE ❑REPAIR PIPING <br /> cc <br /> w M 0 r <br /> >O HAS DISCHARGE BEEN STOPPED T ❑REPAIR TANK ❑CLOSE TANK S FILL IN PLACE ❑CHANGE PROCEDURE <br /> U <br /> �' ❑ YES = NO IF YES,DATE I ❑REPLACE TANK ❑ OTHER <br /> o M o r r <br /> SOURCE OF DISCHARGE CAUSE(S) <br /> w <br /> j< TANK LEAK UNKNOWN OVERFILL RUPTURE/FAILURE ❑ SPILL <br /> (a O ❑ PIPING LEAK ❑ OTHER ❑ CORROSION ❑ UNKNOWN ❑ OTHER <br /> w w CHECK ONE ONLY <br /> O ❑ UNDETERMINED ❑ SOIL ONLY GROUNDWATER ❑ DRINKING WATER -(CHECK ONLY IF WATER WELLS HAVE ACTUALLY BEEN AFFECTED) <br /> CHECK ONE O <br /> w ❑ ACTION TAKEN ❑ PRELIMINARY SITE ASSESSMENT WORKPLAN SUBMITTED ❑ POLLUTION CHARACTERIZATION <br /> cc <br /> =ti LEAK BEING CONFIRMED ❑ PRELIMINARY SITE ASSESSMENT UNDERWAY ❑ POST CLEANUP MONITORING IN PROGRESS <br /> O ❑ REMEDIATION PLAN ❑ CASE CLOSED(CLEANUP COMPLETED OR UNNECESSARY) ❑ CLEANUP UNDERWAY <br /> CHECK APPROPRIATE ACTION(S) ❑ EXCAVATE b DISPOSE(ED) ❑ REMOVE FREE PRODUCT(FP) ❑ ENHANCED BK)DEGRADATION(IT) <br /> IME HACK KA OVAISI <br /> 50 ❑ CAP SITE(CD) ❑ EXCAVATE S TREAT(ET) ❑ PUMP 3 TREAT GROUNDWATER(GT)❑ REPLACE SUPPLY(RS) <br /> w Q ❑ CONTAINMENT BARRIER(CB) ❑ NO ACTION REOUIRED(NA) ❑ TREATMENT AT HOOKUP(HU) ❑ VENT SOIL(VS) <br /> ❑ VACUUM EXTRACT(VE) OTHER(OT) <br /> o' 44-:5 G� <br /> uj S J. C&a';�2 <br /> NSC 05;&W <br />