Laserfiche WebLink
r <br /> III f <br /> i <br /> EXTENSIVE FIELD WORK NOTICE <br /> TO: DATE: 10/28/2014 <br /> Kevin Schinmann, 7-Eleven, Inc., Market Manager (2369) kevin.schinmann@7-1 l.com <br /> Sanaye Walker, Field Consultant sanaye.walker@7-1 l.com <br /> Jose Rios, 7-Eleven, Inc., MES iose.rios@7-1 1.com <br /> John Wainwright,Stantec, RSPM john.wainwright@stantec.com <br /> Terry Truax, 7-Eleven, Inc., RPM terry.truax@7-1l.com <br /> Olan Smith, 7-Eleven, Inc., DFM olan.smith@7-1I.com <br /> Stephen Boyd, 7-Eleven, Inc., RGECM stephen.boyd@7-1 l.com <br /> Deanne Rotta, 7-Eleven, Inc.,RGECS deanne.rotta@7-1 l.com <br /> Angelica Sandoval Marin, SJCEHD amarin@sicehd.com <br /> Jivtesh Gill, Franchisee (209) 463-1259 <br /> RE: 7-Eleven Store Number: 14117(Market 2369) <br /> Site Address: .2725�Country.Club Blvd <br /> Stockton, CA <br /> Field Activities: Underground piping removal and site restoration <br /> Dear All: <br /> This serves as notification that removal of the underground piping associated with former <br /> remedial activities at the above referenced 7-Eleven store is scheduled to begin on Tuesday, <br /> November 11, 2014.This work is being conducted in order to comply with the environmental <br /> case closure as directed by the San Joaquin County Environmental Health Department. Asphalt <br /> patching of the former monitoring well locations will also be completed at this time. It is <br /> anticipated that the piping removal and site restoration activities will be completed within three <br /> (3) business days.The removal activities will not impede store operations and the site will remain <br /> accessible for guests. <br /> Three to four parking spaces at a time may be.blocked during the asphalt patching activities. <br /> During the underground piping removal, it will be necessary to close off the driveways to <br /> vehicular traffic; however at least one driveway will remain open at all times. <br /> Any debris generated during this scope of work-will be temporarily stored in 55-gallon drums <br /> pending removal for disposal within two weeks of the completion of the destruction activities. <br /> i <br /> Sincerely, <br /> Stantec Consulting Services Inc. <br /> Danielle Manning <br /> Project Manager <br /> Stantec Consulting Services Inc. <br /> Ph: (916) 384-0706 _ <br /> Fx: (916) 861-0430 <br /> Cell: (916) 281-4942 <br /> Danielle.manning@stontec.com <br /> i <br /> r <br /> 'i <br />