Laserfiche WebLink
a <br /> II <br /> EXTENSIVE FIELD WORK NOTICE _ <br /> i <br /> TO: DATE: 09/12/2014 <br /> Kevin Schinmann, 7-Eleven, Inc., Market Manager (2369) kevin.schinmann@7-1 l.com <br /> Sanaye Walker, Field Consultant sanaye.walker@7-1 l.com <br /> Jose Rios, 7-Eleven, Inc., MES jose.rios@7-1 l.com <br /> John Wainwright, Stantec, RSPM iohn.wainwright@stantec.com <br /> Terry Truax, 7-Eleven, Inc., RPM ferry.truax@7-1I.com <br /> Olan Smith, 7-Eleven, Inc., DFM olon.smith@7-1l.com <br /> Stephen Boyd, 7-Eleven, Inc., RGECM stephen.boyd@7-1 l.com <br /> Deanne Rotta, 7-Eleven, Inc., RGECS deanne.rotta@7-1 Ecom <br /> Angelica Sandoval Marin,SJCEHD amarin@sjcehd.com <br /> Jivtesh Gill,Franchisee (209)463-1259 1 <br /> RE: 7-Eleven Store Number: 14117 (Market 2369) <br /> i <br /> Site.Address: 2725 Country Club Blvd <br /> Stockton, CA <br /> Field Activities: Groundwater monitoring and remediation well destruction <br /> Dear All: j <br /> i <br /> This serves as notification that the destruction of groundwater monitoring and remediation wells. <br /> at the above referenced 7-Eleven store is scheduled to begin on Monday,September 29, 2014. <br /> This work is being conducted in order to comply with the environmental case closure as directed <br /> by the San Joaquin County Environmental Health Department. It is anticipated that the well <br /> destruction activities will be completed within eight (8) business days.The well destruction j <br /> activities will not impede store operations and the site will remain accessible for guests. <br /> Three to four parking spaces at a time may be blocked during the destruction activities. During <br /> the destruction of wells 1-5 and MW-3,the western driveway along Country Club Boulevard may <br /> be closed. <br /> The asphalt areas impacted by groundwater monitoring well destruction activities will be <br /> covered with a temporary patch and resurfaced at a later date.Well destruction debris <br /> generated during this scope of work will be.temporarily stored in 55-gallon drums pending <br /> removal for disposal within two weeks of the completion of the destruction activities. <br /> Sincerely, <br /> Stantec Consulting Services Inc. <br /> j <br /> Danielle Manning <br /> Project Manager <br /> Stantec Consulting Services Inc. <br /> Ph: (916) 384-0706 <br /> Fx: (916)861-0430 <br /> Cell: (916) 281-4942 <br /> Danielle.manning@stanfec.com <br /> 1 <br />