Laserfiche WebLink
Owl., <br /> San Joaquin County <br /> .� Environmental Health Department DIRECTOR <br /> 1868 East Hazelton Avenue Donna Heran, REHS <br /> N' { Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco, REHS,RDI <br /> cq. _..•�P Kasey Foley,REHS <br /> F O RWebsite: www.sjgov.org/ehd Linda Turkatte, REHS <br /> Phone: (209) 468-3420 Rodney Estrada, REHS <br /> Fax: 209) 464-0138 Adrienne Ellsaesser, REHS <br /> July 22, 2014 <br /> Southgroup Acquisition Company LLC <br /> 15 Atkinson Road <br /> Rockville Center, NY 11570 <br /> Subject: 7-Eleven Store #14117 <br /> 2725 Country Club Blvd <br /> Stockton, CA 95204-3937 <br /> The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br /> Work Plan for Well Destruction, dated 30 May 2014, prepared and submitted by your consulting <br /> firm, Stantec Consulting Services, Inc. (Stantec), on your behalf for the above-referenced site. <br /> In Work Plan for Well Destruction, Stantec proposed destruction of a total of 12 wells. Based on <br /> recent groundwater data and residual soil impact, Stantec proposed to destroy monitoring wells <br /> MW-3, MW-4, MW-8 and oxygen injection wells, 1-4 and 1-5 by over drilling and removing all well <br /> contents (conductor casing, well casing, screen, filter pack, grout sealant). Stantec proposed to <br /> destroy the remaining wells, MW-1, MW-5, MW-6, and MW-7 and oxygen injection wells 1-1, 1-2, <br /> and 1-3 by pressure grouting. The pressure grouting method briefly consists of filling the well and <br /> filter pack with neat cement grout through a tremie pipe from total depth to top of well casing. <br /> Grout will settle and then topped off before pressure is applied to the wells at 25 pounds per <br /> square inch for ten minutes. The proposed well destruction through pressure grouting is approved <br /> by EHD except for monitoring well MW-6, due to residual methyl-t-butyl-ether (MTBE) in <br /> groundwater. Monitoring well MW-6 must be over drilled along with the wells previously proposed <br /> for over drilling. In the work plan, Stantec proposed to submit a Well Destruction Report after all <br /> wells have been destroyed summarizing the field activities. In addition to the relevant data, <br /> include properly signed manifests for all disposed water/soil waste related to the destruction of the <br /> wells at this site. <br /> Stantec proposed to use neat portland cement as the sealing material for the wells. All water <br /> used for the purpose of sealing a well must be potable water and not water that has been <br /> displaced from a well that is.to be destroyed. With these conditions, the EHD approves the work <br /> plan. Please submit a completed Mast r�vi1q Record form, a Well and Boris yrDVt Application ,���✓ <br /> form, and a permit/inspection fee of $�o5-80 (permit fee will increase to $1,,145.00 as of August <br /> 1, 2014). Notify the EHD for inspection of all destruction of wells at least two weeks prior to <br /> destruction activities. The EHD will issue a closure letter once and all wells have been properly <br /> destroyed and appropriately signed waste manifests have been submitted to this agency. <br /> Please contact Angelica Sandoval Marin (209) 468-2807 or amarin@sjcehd.com if you have any <br /> questions. _ <br /> s <br /> S' erely, <br /> r � <br /> Angelica S. Marin, REHS Nuel C. Henderson, Jr., PG <br /> Registered Environmental Health Specialist Senior Engineering Geologist <br />