Laserfiche WebLink
08/28/98 MOIL 11:54 FAX GROUNDWATER [ � Wulf. <br /> �✓ <br /> Rem PutmIsomin Hownith and SaWaft pew -SKiRtMIMad 14117. 1f►tacldt , =A. y3 <br /> Part allgnotoMine Hom"h sng_"TV Plan Udermathm . 1ST <br /> I PREFACE <br /> 3 <br /> This RP HASP is wrMn to ensure the vosi being of all Fluor Daniel GTI,Inc.(Fluor Daniel GTI)field <br /> personnel and the community surrounding the site. Accordingly,project staff and approved Fluor <br /> Daniel GTI subcontractors must follow the policies and procedures establMed in this RP HASP, This <br /> RP HASP contains three sections: Parts/I B,and C. PartA omtains site-specft emergency <br /> Wormalion.hazard analysis,and project information that can be used in conjunction with the serer of <br /> spec'>fic,laminaWd health and safety reference cards In Part C. Part B contains standardized guidance <br /> Procedures acrd prackes to follow for all retail petroleum open3dons. Part C contains a-ser'&of task- <br /> specfic guidelines in the form of laminated work sheens dist ani to be used as"tip sheets"Far <br /> preparing and presenting the daily tollgate safety meeting at the job site. <br /> Based on ft project act hies and tasks conducted at this sla,all personnel assigned to this project <br /> must read part A of this RP HASP,the applicable sections of Part B,and them sign the Agreement acrd <br /> I Acknowledgment$beat on page iv to confirm that they understand and agree to abide by the provisions � <br /> of this plan, <br /> l <br /> C <br /> MCM oAMa arra <br /> re,na2a <br /> s <br />