My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:51:32 AM
Creation date
6/25/2019 8:26:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1• <br /> WORK PLAN <br /> ' SOIL INVESTIGATION <br /> Libbey Owens Ford Co. <br /> ' 500 East Louise Avenue <br /> Lathrop, California <br /> ' San Joaquin County <br /> ' Prepared by <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> ' June 20, 1996 <br /> ' 1.0 INTRODUCTION <br /> This soil investigation work plan was prepared by Condor Earth Technologies, Inc. (Condor) <br /> ' at the request of the Libbey Owens Ford Co. (LOF). The purpose of the proposed work is to <br /> investigate suspected leaking underground product piping associated with an above ground diesel tank <br /> located at the LOF site (Figures 1 and 2). The product piping is suspected to have leaked due to a <br /> recent inventory loss. The proposed work includes the excavation of a portion of the underground <br /> ' piping at jointed sections where the leak is most likely to have occurred. It is anticipated that 50 to <br /> 100 cubic yards of soil will be excavated during the fieldwork. The excavation equipment and <br /> ' operator will be provided by Erickson Inc., of Richmond, California. A Condor geologist will be <br /> present during the fieldwork to observe the investigation and collect soil samples. <br /> ' All work will be conducted in accordance with the San Joaquin County Public Health <br /> ' Services, Environmental Health Division (PHS/EHD), and the California Regional Water Quality <br /> Control Board (CRWQCB)requirements. Included in this work plan is a description of the proposed <br /> tfieldwork, laboratory analyses, and reporting. In addition, a project health and safety plan is attached. <br /> ' 2.0 FIELDWORK <br /> 2.1 Site Preparation <br /> ' Underground utilities located within the proposed excavation area will be identified by LOF <br /> • prior to the fieldwork. Ron Rowe of the PHS/EHD will be notified of the fieldwork schedule at least <br /> ' 48 hours in advance. <br /> ' t, CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.