Laserfiche WebLink
WORK PLAN ADDENDUM <br /> SOIL REMEDIATION CONFIRMATION SAMPLING <br /> Libbey-Owens-Ford Co. <br /> 500 E. Louise Avenue <br /> Lathrop, California <br /> Prepared by: <br /> Condor Earth Technologies <br /> November 23, 1993 <br /> LO PURPOSE <br /> This document is an addendum to the "Work Plan - Soil and Groundwater Investigation and <br /> Remediation" dated October 15, 1993 for work inside the wareroom building at the Libbey-Owens-Ford <br /> Co. (LOF) building in Lathrop. The original work plan and a subsequent letter addendum dated <br /> October 22, 1993 contained an introduction, a brief site history, a detailed description of the proposed <br /> investigation of soil and groundwater, and outlined a general soil and groundwater remediation <br /> strategy. This workplan was approved by the California Regional Water Quality Control Board <br /> (RWQCB) on October 23, 1993. The purpose of this work plan addendum is to further describe the <br /> excavation that is proposed for soil remediation, and to present a proposed confirmation sampling <br /> program <br /> As discussed in the original work plan, it is critical that necessary remedial actions are <br /> implemented as soon as possible to avoid delays in a 44 million dollar modernization effort for the <br /> facility. LOF is committed to expeditious implementation of the work plan and addendums, and <br /> requests that Regional Water Quality Control Board Staff(Regional Board) provide prompt review, <br /> comments and approval of this addendum. <br /> Nkiw- <br /> �.� CONDOR <br />