Laserfiche WebLink
Mr.Mike Bowles <br /> August 24,2001 <br /> Page 2 <br /> Response to the third comment: <br /> As requested by the Regional Board, the hydrated thickness of the bentonite seal will be limited <br /> to approximately two feet. <br /> Response to the fourth comment: <br /> Condor will direct the driller to surge the sand pack using a surge block or metal bailer before <br /> placement of the bentonite seal. <br /> We are including a copy of this letter for submission to Mr. O'Brien. Based on the conditional <br /> approval from Mr. O'Brien, we are moving ahead with scheduling the well installation. We will <br /> provide a schedule when we have a firm commitment from the driller. If you have any questions, <br /> or if we can provide additional support in your response to Mr. O'Brien, please do not hesitate to <br /> call. <br /> Respectfully, <br /> Condor Earth Technologies,Inc. <br /> Jeff Willett, P.E. <br /> Senior Project Manager <br /> P:V 151A PLOF\Letter to Mike Bowles 8-24-0 Ldoc <br />