Laserfiche WebLink
II. GENERAL INFORMATION: <br /> I. Obtain an FPA Site Number from the Department of Toxic Substances Control (800) 6I-TOXIC for <br /> temporary hazardous waste removal activities associated with underground storage rank(UST) removals_ <br /> 2. Disposal Information: Public Health Services Underground Storage Tank Disposition Tracking Record <br /> (UST Tracking Record, page 10) sdall accompany each rank removed from site. Tanks) will be issued <br /> an identification number which PHS-EHD's representative will note on the UST Tracking Record. <br /> Contractor will affix same identification number onto tank and using Fluorescent spray paint. Contaminated <br /> tanks and/or pining are to be transported under Hazardous Waste Manifest by a state registered hazardous <br /> waste hauler. <br /> 3. Conauctor to Provide: Combustible!Fiatpmable;as detector(to verify the Tower Explosive Limit (LEL) <br /> atmosphere and oxygen level of tank prior to lifting from excavation),adequate rtumber(s) and appropriate <br /> type(s) of ure extinguisher(s), barriers to secure rile area as necessary to minimise traffic and pedestrian <br /> interference, and fluorescent spray paint to affix tank identification numbers. It shall be the project <br /> manager's responsibility for compliance with all health do safety regulations and requirements, which shall <br /> be strictly adhered to at ail times during the course of the closure activities. <br /> 4 The PHS-1FID permit shall be on site during tank excavation and removal. <br /> 5. Any changes in this document shall be approved by PHS-EHD prior to initiating work. <br /> 6. Closure-in-Place: If Closure-in-Place is the suggested method of abandonment. complete form <br /> EH 23 439 and submit written approval from the local Fire Department. <br /> Temporary Closure: If Temporary Closure is the suggested method of abandonment, complete <br /> and submit this form and a written approval from the local Fire Department- <br /> 8. <br /> epar ment_8. The following documentation shall be submitted within 30 days of the tank removal <br /> date: <br /> a) Analytical results, trailed directly from laboratory to PHS-EHD, including a chain of custody and <br /> quality assurance and quality control(QA & QC). <br /> b) UST Tracking Record Sheets) and/or Tank Hazardous Waste Manifest(s)_ <br /> C) Hazardous Waste Manifests for piping, rinsate, residual fuel, or waste oil receipt. <br /> d) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated <br /> City Building Departments. This report will be referred to the appropriate agency for their <br /> review. <br /> A site which has had UST(s) removed, shall not be considered for final closure until the above items <br /> are submitted for review. <br /> III. SITE MITIGATION: <br /> 1. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is <br /> the responsibility of the owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior <br /> to initiating any assessment or remediation activities. To minimize deiays. a Corrective Action Plan may <br /> be submitted concurrent with rank closure or installationplans. Address one copy of the Corrective?action <br /> Plan to the Site Mitigation Unit for review. For further assistance contact the Site Mitigation Unit at(209) <br /> 468-33450, <br /> EH 23 046 (Revisedl0/24/97) pare 2 <br />