Laserfiche WebLink
' CJenfog' aI?ecFutirsZru. Pag <br /> Soil Boring and Monitoring Well Installation Work Plan e 3 <br /> Artic Ice(D St.) <br /> Project No. 691.2 <br /> November 20, 1998 <br /> reportwill be forwarded to San Joaquin County within one week of receipt of laboratory <br />'r data. Anticipated submittal date is Dec. 16, 1998. <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc: in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time . <br /> of this investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plait was prepared by: <br /> GGeo(ogica[Technics Zne. <br /> Raynold I. Kablanow II, Ph.D. <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologist#442 <br /> t <br /> Lt " <br />