Laserfiche WebLink
JOB NAME 7-Eleven Store#20632 JOB NUMBER 77EL 20632 03 0703 <br /> SITE ADDRESS 4627 Da Vinci Drive START DATE _ o <br /> Stockton,CA DATE PREPARED 07/30/03 <br /> PREPARED FOR PREPARED BY Brian Care <br /> 1 Arrive at site-Review 1 HASP, 2 work order,then call Brian Carey in Sacramento <br /> Site is an active,gasoline dispensing service station <br /> Check in with si#e mans er Business Phone 209 952-3543, Franchisee Man it&Gur al Grewal <br /> 2 Oen wells shown on attached table and let groundwater levels equilibrate DTW should be approximately 6 to 8 <br /> feet+or- <br /> a Monitor DTW, DTB, PT,and DO in the well shown on attached table(Top of Casing) <br /> Note calibration readin s for D O meter and take D O readings in bucket with agitated water <br /> Note if well has measurable thickness of product,visual!y inspect with bailer <br /> Sample Order Clean to Dirty___See Gauging Sheet. <br /> 4 Using a Grundfos purne system, u e three raasin2 volumes of water per well <br /> Measure&record pH,conductivity,and temperature of the Eurged water from the well <br /> 5 Collect four 40-m1 preserved VOAs from the well BTEX,TAH ,&5 Oxygenates 82608 <br /> 6 Place all puMe water in a 55:gallon drum and store onsite Be sure to properly label drum <br /> Note contents of drum on field notes Note location of drum on attached site ma <br /> 7 Fill out COC and request EPA 8260B on"Standard Turnaround" <br /> 8 Deliver all samples to Kiff Analytical A 2795 2nd Street,Suits 300,Davis,CA 95616 <br /> 530 297-4800 <br /> 9 Call Jaff Auchterlonie in Sacramento before you leave the site 916 861-0400 ext 223 or cell 916 825-4607 <br /> 10 Fill Out Equipment Billin Sheet for all equipment used on the job and attach with field notes <br /> 11 Give copies of all notes and COC's to Brian Carey,ASAP <br /> 12 Bill Travel time to 77EL 20632 03 0711 <br /> Bill labor time to 77EL 20632 03 0703 not to exceed 6 hours onsite labor <br /> Health&Safety Site Plan <br /> 28-40 ml preserved !-ICI VOAs(bring extra containers and cooler with ice <br /> Grunfos Pump System, pH/Temp/Coed Meter,DO Meter,Disposable Bailers,COC's,drum labels, etc <br /> 112",9116',and 15116"sockets,and other mise tools <br /> ONE 65-gallon drum <br /> Direct all questions to Jaff Auchterlonie, 916 861-0400 ext 223-office <br /> PROJECT MANAGER, Jaff Auchterlonie AUTHORIZATION <br />