Edward Niemann -2- May 22, 2001 <br /> Claim No. 015947 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approved Comments <br /> Drill one soil boring to approx.47 <br /> 1 $ 177 feet bgs or approx. 15 feet below <br /> Permitting first water. <br /> WTOTAL <br /> ll Installation, $3,245 <br /> pment, Sampling, $_965 <br /> egan <br /> Preparation and Submittal $ 920 <br /> E-APPROVED $5,307 <br /> * Task descriptions are the same as those identified in Ground Zero Analysis,Inc.'s April 23,2001 cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Ground Zero Analysis, Inc. proposal in my pre-approval <br /> above,please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the <br /> costs as presented in the proposal dated April 23, 2001 by Ground Zero Analysis, Inc. for <br /> conducting the work approved by the County for implementing the April 10, 2001, Ground <br /> Zero Analysis, Inc. workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> Caiilorn,a Environmenta/Protection Agencv <br /> 0 A <br /> Ree;r/edFRper <br />