My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DAVIS
>
8709
>
3500 - Local Oversight Program
>
PR0544612
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2019 12:41:58 PM
Creation date
7/1/2019 11:24:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544612
PE
3528
FACILITY_ID
FA0009287
FACILITY_NAME
NORTH STOCKTON AUTO SVC INC
STREET_NUMBER
8709
Direction
N
STREET_NAME
DAVIS
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242018
CURRENT_STATUS
02
SITE_LOCATION
8709 N DAVIS RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> All contaminated personal „protective egyinment lie gloves, coveralls), will be placed on and <br /> covered with 6-mil plastic sheeting along with the drill cuttings. <br /> Location of Wash Water. At site. <br /> Location of Toilet. At site. <br /> Location of Drinking Water. At site. <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP L7 CHECK WHEN DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> determined. <br /> EMERGENCY RESPONSE <br /> In case of an emergency, the branch/corporate safety officer must be notified by the site safety <br /> officer or project manager. The site safety officer or her/his alternate will notify outside emergency <br /> response agencies (ER) as needed, the branch/corporate safety officer, and the project <br /> supervisor/manager. The branch/corporate safety officer will make any required reports to local, <br /> state, and federal agencies. Other emergency notifications will include: <br /> ER Agency: Fire/Police Depts. Phone: 911 <br /> ER Agency: Ambulance Phone: 911 <br /> Site Safety Officer: Sean Garvey On-site Phone: 209/470-3482 <br /> Pager No. 209/576-8402 <br /> Site Safety Alternate: John Lane Office Phone 209/838-9888 <br /> Corporate Safety Manager: John Lane Office Phone: 209/838-9888 <br /> Project Manager: Greg Stahl Office Phone: 209/838-9888 <br /> Pager No. <br /> Other: Client Representative Ed Niemann Office Phone: 209/478-1614 <br /> PAGE 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.