My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DIAMOND
>
1050
>
2900 - Site Mitigation Program
>
PR0001781
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 11:56:44 AM
Creation date
7/3/2019 10:31:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0001781
PE
2960
FACILITY_ID
FA0004090
FACILITY_NAME
DIAMOND WALNUT GROWERS INC
STREET_NUMBER
1050
STREET_NAME
DIAMOND
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
155 320 19 5
CURRENT_STATUS
01
SITE_LOCATION
1050 DIAMOND ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING P%moGRAM NO.R5-2002-0821 *a/ 4 <br /> DIAMOND WALNUT GROWERS INC. <br /> dba DIAMOND OF CALIFORNIA <br /> 1050 SOUTH DIAMOND STREET,STOCKTON <br /> SAN JOAQUIN COUNTY <br /> submitted with the fourth quarter monitoring report. The annual report shall contain the following <br /> minimum information: <br /> (a) both tabular and graphical summaries of all data obtained during the previous year; <br /> (b) groundwater contour maps and pollutant concentration maps containing all data obtained during the <br /> previous year; <br /> (c) a discussion of the long-term trends in the concentrations of the pollutants in the groundwater <br /> monitoring wells; <br /> (d) an analysis of whether the pollutant plume is being contained or is continuing to spread; <br /> (e) a description of all remedial activities conducted during the year, an analysis of their effectiveness <br /> in removing the pollutants, and plans to modify the remediation approach; <br /> (f) the anticipated date for completion of cleanup activities; <br /> (g) an identification of any data gaps and potential deficiencies/redundancies in the monitoring system <br /> or reporting program; and <br /> (h) if desired, a proposal and rationale for any revisions to the groundwater sampling plan frequency <br /> and/or list of analytes. <br /> The results of any monitoring done more frequently than required at the locations specified in the MRP <br /> also shall be reported to the Board. The Discharger shall implement the above monitoring program as <br /> of the date of the Order. <br /> Ordered by: - I ) <br /> THOMAS R. PINKOS,Acting Executive Officer <br /> 3 Jwl., 2002. <br /> (Date) <br /> m /diamond.m'p 7o3oO2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.