Laserfiche WebLink
r <br /> Mr. Michael J. Infurna, Jr. <br /> August 26, 1998 <br /> Page 2 <br /> If the constituents analyzed are not confirmed to be present in groundwater at or above <br /> relevant water quality objectives during both proposed sampling events, CPL will request <br /> that no further action be required and that a closure letter be issued by San Joaquin <br /> County Public Health Services,Environmental Health Division. <br /> The field work (i.e.,temporary monitoring well installation, development, and first round <br /> of sampling) will be scheduled within two weeks of obtaining the appropriate permits. <br /> You will be notified 48 hours prior to implementation of field work or if there are any <br /> changes in the schedule. Please call either Elizabeth Lu with CPL at (925)842-6855 or <br /> Michael Keim at(415)434-9400 of Geomatrix Consultants, Inc. if you have any <br /> questions. <br /> Sincerely, <br /> Afxt�T• (� <br /> K.L. dower <br /> Project Manager <br /> California Site Remediation <br /> cc: Elizabeth Lu—CPL/Geomatrix Consultants, Inc. <br /> Michael Keim—Geomatrix Consultants, Inc. <br /> Ed Griswold—Surland Homes <br /> Attachments: Figure I <br /> Figure 2 <br />