My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DORSET
>
2532
>
2900 - Site Mitigation Program
>
PR0508012
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 2:18:55 PM
Creation date
7/3/2019 11:58:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508012
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0007884
FACILITY_NAME
SURLAND HOMES - TAOC PIPELINE
STREET_NUMBER
2532
STREET_NAME
DORSET
STREET_TYPE
LN
City
TRACY
Zip
95376
APN
23830005
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2532 DORSET LN TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:21DA64AB-45D9-402D-84E1-762AFA5983F3 <br /> Old Valley Pipeline Right of Way <br /> Tracy,CA <br /> after termination of this Agreement shall indemnify,defend,and hold Grantor and <br /> the Property harmless from and against any and all loss, damage, injury, Lability, <br /> and claims thereof resulting directly from such bens and attachments. <br /> 4.4 LIMIT AUON ON CI-A15SF5 OF DA_-MAGF&- As to Anims arisiag from this <br /> Agreement or the performance of the Work on the Property by EMC Group or its <br /> representatives, no Party is liable to any other Party for any of the following,: (A) <br /> indirect or consequential loss; (B) loss of profits, loss of prospective economic <br /> advantage or benefit,or loss of bensi opportunity,wbealmr direct or indiner4 or <br /> (C)punitive or exemplary-damages. <br /> 5. INSURANCE <br /> 5.1 EMC will require conarzictors who perform the Work under this Agreement to maintain all <br /> insruance required by law and hab@ity utsmmoce coverage in knee with the <br /> contractors' service agreements. <br /> 6. GOVERNING LAW AND RESOLUTION OF DISPUTES <br /> 6-1 Governing Law.This Agreement is governed by and int+erpmted in accordance Faith the <br /> law of the State of California. whhout regard to its choice of law auks, except that the <br /> substantive and procedural rules of the Federal Arbitration Act, 9 U.S.C. §§ 1-16 govern <br /> Section 6.2 (Resolution of Disputes). <br /> 62 Resolutions of Disputes. The Parties shall exclusively and finally resolve any dispute <br /> bef ven them using direct neglDnamions,awdiatiao~and then arbitration as set out m this <br /> Section 6.2 (Resolution of Disputes). If a dispute arising out of this Agreement is not <br /> resolved by direct negotiations,either Party may initiate mediation by giving notice to the <br /> other setting out the disputed issues and the value of the claim.Mediation must be attended <br /> by a representative Gum each Party with decision-malcing authority.All mediafim fees and <br /> costs must be paid equally and each Pmrty shall bear its oven attorne<s' fees and costs in <br /> connection with such mediation. if the Parties fail to resolve the dispute within 60 days <br /> from notice of mediation, either Party may initiate binding arbitration by giving notice to <br /> the other Party_The place of arbitration must be in the State where the Property is located. <br /> One arbitrator (or 3 arbitrators if the monetary value of the dispute is more than <br /> USS5,000,1ZW or its currency equivalent,ar if there is a dispute%hethcr the monetary%-Jue <br /> exceeds the US$5,000,000) will conduct the arbitral proceedings in accordance with the <br /> then existing Commercial Arbitration Rule of the American Arbitration Association <br /> ("AAA')- The arbitrator(s) must be appointed as provided in the AAA Commercial <br /> Arbitration Rules.The maximum number of witnesses each Party may call to give evidence <br /> is 3 witnesses of fact and 1 expert witness 1 he arbitration award is final and binding <br /> Regardless of which Party prevails,all arbitration fees and costs must be paid equally and <br /> each Party shall bear its own attorneys' fees and costs in connection with such arbitration. <br /> The Parties waive irrevocably their right to any form of appeal,review,or recourse to any <br /> court or other judicial authority under any applicable law to the extent that such Wvaiver <br /> ma) be validly mom_Proceedings ti)(A)presm2 property or so&injunctive relief or(B) <br /> enforce an award under this Section 6.2(Resolution of Disputes), may be brought in any <br /> court of competent jurisdiction. <br /> 7. GENERAL PROVISIONS <br /> Old Valtzy Pigdm Ri&of Way,Tracy_CA <br /> FCC ES Law Site Access Agreement Outdoor U.S.(Rev7 July 2018) 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.