My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DOUGLAS
>
800
>
2900 - Site Mitigation Program
>
PR0527568
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 1:52:22 PM
Creation date
7/3/2019 1:30:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527568
PE
2950
FACILITY_ID
FA0018677
FACILITY_NAME
SIMMS GRUPE MANAGEMENT CO
STREET_NUMBER
800
STREET_NAME
DOUGLAS
STREET_TYPE
RD
City
STOCKTON
Zip
95207
APN
09746339
CURRENT_STATUS
01
SITE_LOCATION
800 DOUGLAS RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEIIwiGEL DE <br /> the intended use of the document, Kleinfelder may require that additional work be <br /> performed and that an updated document be issued. Non-compliance with any of <br /> these requirements by the client or anyone else will release Kleinfelder from any liability <br /> resulting from the use of this document by any unauthorized party. <br /> The fees presented in this proposal are based on prompt payment for services <br /> presented in Kleinfelder's standard invoicing format. Additional charges will be applied <br /> for specialized invoicing and/or if backup documentation is needed. These special <br /> services will be charged on a time and expense basis. Late fees will be charged if <br /> payment is not received in accordance with terms contained in our contract. <br /> This proposal is based on Kleinfelder's standard Professional Services Agreement <br /> (contract) which is attached. If changes are made to the terms and conditions, or if an <br /> additional insurance or liability coverage is desired, Kleinfelder reserves the right to <br /> modify its proposal/fee. Additionally, if an alternative contract is desired, some delays <br /> may be incurred as a consequence of our review. <br /> The safety of our employees is of paramount concern to Kleinfelder. You will be <br /> notified if the location of your project represents a potential safety concern to our <br /> employees. Unsafe conditions for field work will require a modification of our estimated <br /> scope of work and associated fees. We will advise you of the additional costs <br /> necessary to mitigate these unanticipated conditions, if applicable. <br /> The attached cost estimate assumes this proposal will be sufficient as a workplan, if <br /> requested by the county to obtain boring permits. If a separate workplan is needed, the <br /> costs will be billed on a time and expense basis. <br /> 02001 PROP.ENV/ST07P271/D GD:Iv(ra Page 8 of 8 <br /> ©2007 Kleinfelder October 31,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.