Laserfiche WebLink
K L E t N F E L DER <br /> To reduce the potential for introducing contaminants into the samples, the drive tip, <br /> galvanized pipe, and other equipment used for sample collection are steam cleaned <br /> and/or washed with trisodium phosphate or non-phosphate detergent solution and <br /> double rinsed with distilled water prior to use. The sample probe and filters are cleaned <br /> in TSP solution and rinsed with methyl alcohol followed by a distilled water rinse prior to <br /> use. New, factory-sterilized syringe needles, O-rings, septums and sample tubes are <br /> used for each sample. <br /> B-2.6 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to <br /> Kleinfelder's office sample control or to the analytical laboratory. A Kleinfelder chain-of- <br /> custody form accompanies the cooler. The chain-of-custody form includes Kleinfelder's <br /> name, address and telephone number, the employee number of the individual who <br /> performed the sampling, the sample numbers, the date and time the samples were <br /> collected, the number of containers each sample occupies, the sample matrix (soil or <br /> water) and the analyses for which the samples are being submitted, if any. The chain- <br /> of-custody form is signed by each person who handles the samples, including all <br /> Kleinfelder employees and the receiving employee of office sample control or the <br /> analytical laboratory when the samples are delivered. <br /> B-2.7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are <br /> steam cleaned prior to drilling each boring. In addition, sampling equipment is cleaned <br /> with a trisodium phosphate or non-phosphate detergent wash and rinsed with distilled <br /> water prior to collecting each soil sample. <br /> B-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. <br /> Closure is accomplished by grouting the boring with a cement/bentonite slurry or as <br /> otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the <br /> boring and left on site for disposal by the site owner. If requested, Kleinfelder can <br /> coordinate disposal of soil and water after analytical results are available. <br /> B-3 GROUNDWATER WELL INSTALLATION <br /> B-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows: <br /> The well casing are 2- or 4-inch inside diameter, flush threaded joint, schedule <br /> 40 PVC pipe. <br /> 02001 PROP.ENV/ST07P271/DGD:ly/ra Page B-3 <br /> ©2007 Kleinfelder October 31,2007 <br />