Laserfiche WebLink
08 October 1999 <br /> AGE-NC Project No. 95-0197 <br /> ' Page 5 of 5 <br /> southeast of the former southwest fuel dispenser island area,to delineate adsorbed petroleum <br /> hydrocarbon impact; the work plan should also include collection of"grab" ground water <br /> samples to address the dissolved MTBE plume.northeast and east of MW-2 <br /> ' 4 A search for all potential ground water receptors within a 2,000-foot radius of the site. <br /> 5.0. LIMITATIONS <br /> ' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings'were based mainly <br /> upon analytical results provided by an independent laboratory. Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data paints (e.g. ground water monitoring, ground water samples), and subsurface <br /> ' conditions may vary away from these data points. No other warranty, expressed or implied, is made <br /> as to the professional recommendations contained in this report. <br /> 1 <br /> Advanced GenEmironmental,Inc. <br />