Laserfiche WebLink
California RL,"gional Water Qualitylontrol Board <br /> iUCentral Valley Region <br /> Robert Schneider,Chair (a <br /> Terry Taminlaen <br /> Arnold <br /> Secretary for Sacramento Main Office vgger <br /> Environmental Internet Address: httpY/w .SwrCb.ca.gov/wgcb5 Gooveernorrnor <br /> a <br /> Protection 11020 Son Center Dnw#200 Rancho Cordova,CA 95670.6114 <br /> Phone(916)4643291 <br /> 4 October 2004 <br /> George and Mei Teranishi <br /> George's Service Station <br /> 1600 Durham Ferry Road <br /> Tracy, CA 95376 <br /> WORK PLAN,BENCH SCALE TESTING,AND WORK PLANADDEND UM, GEORGE'S SERVICE, <br /> 1600 DURHAM FERRYROAD, TRACY,SAN JOAQUIN COUNTY, <br /> I reviewed two documents, Work Plan,Bench Scale Teeting(Workplan) dated 23 August 2004 and Work Plat <br /> Addendum (Addendum) dated 22 September 2004,both submitted by Geological Technics, Inc. (GTI)on your <br /> behalf. The Workplan proposes a Bench Scale Test(BST) conducted by subcontractor SECOR International, <br /> Inc. (SECOR). SECOR's protocol for the BST is included as an attachment to the Workplan. The Addendum <br /> proposes the collection of one groundwater and one soil sample that uses analytical results of dissolved metals <br /> and general minerals to produce theoretical calculations in a geochemistry evaluation(GE)report to determine <br /> whether a BST is necessary prior to a Pilot Study. <br /> The Workplan and Addendum are tentatively approved as written with the following conditions: <br /> • GTI/SECOR must collect and analyze at least one representative soil and groundwater sample from the <br /> ozone injection target zone at the site. The GE report will compare the results of the soil and <br /> groundwater, and thoroughly discuss the expected worst-case scenario reactions, i.e., 100% conversion of <br /> constituents of concern into contaminants,reporting the chemical reactions in molar concentrations. <br /> • if metals of concern (Ce', etc.) are not detected, or general minerals(SO4,etc.) are not present at levels <br /> favorable for adverse reactions in saturated soil, then you may proceed to the Pilot Study phase after final <br /> approval of the GE report. Note that all Pilot Study analytical detection limits must be sufficiently low to <br /> test the theories proposed in the Reports and provide comparisons to Water Quality Objectives in the GE <br /> report. You will continue to monitor groundwater during the Pilot Study for the know petroleum <br /> hydrocarbon contaminants and general parameters(dissolved oxygen, pH,specific conductance, <br /> temperature). <br /> • If metals of concern (Crb', etc.) are detected, or minerals of concern(SO4, etc.)are detected at potentially <br /> harmful levels, then a BST will be conducted to show which contaminant(s) are produced; and whether <br /> the produced contaminants)will persist after termination of ozone injecdon, using the graphed slope of <br /> the declining contaminant(s)concentrations versus time to calculate a decay rate(time to revert to non- <br /> detect). If a contaminants) is produced and persistent,provide that information in a report for my <br /> review. If contaminant(s)produced are not persistent,provide a BST Report containing modifications to <br /> the Pilot Study monitoring program,specifically,the frequency of analyses needed to confirm <br /> contaminant decay rates as calculated from BST analytical evidence. <br /> • During the Pilot Study phase, groundwater sampling and analyses will be conducted immediately before <br /> startup of the ozone injection system, and at intervals of one and 2 hours afterwards, in order to validate <br /> California Environmental Protection Agency <br /> E0iE0'd ES02 SSE 9T6 nD—ODOM i 92:80 b00E—ET—iDO <br />