Laserfiche WebLink
DEI.-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOO 1998 <br /> SAMPLE LOCATION/MW - 5 DATE: 5129198 <br /> PROJECT NAME. GEORGE S SERVICE ANALYSIS PERFORMED- TPH-GAS B T X E <br /> ADDRESS 1600 DURHAM FERRY ROAD SAMPLE TIME 1748 <br /> CITY.STATE TRACY,CA SAMPLE CONTAINERS: 2 V O A S & I B B <br /> SITE CONTACT GEORGE OR MAE PRESERVATIVES: HCL <br /> CONSULTANT GEOLOGICAL TECHNICS JNC LAB.ANALYSIS BY- S14ERWOOD <br /> PROJECT MANAGER RAY OR MIKE MONUMENT: FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA. 2" / 0 1632 <br /> SAMPLE MEDIA GROUNDWATER PID.READING/ODOR: 42 PPM GAS <br /> TOP OF CASING ELEVATION. MSL COLOR BROWN TO CLEAR <br /> DEPTH TO WATER (feet-100th's) 932 FEET CALL.PURGE VOL.. 096 GAL <br /> DEPTH OF WELL: (feet100th's) 1460 FEET TOTAL VOLUME PURGED 3 GAL <br /> STANDING WATER COLUMN: 528 FEET DEPTH OF PUMP: N/A FEET <br /> FIELD PARAMETERS <br /> • TIME CASING DRAW PUMPING pH E.C. TEMP. O.R.P LSSOLVEID TURBIDITY <br /> VOLUNM DOWN RATE OXYGEN COLOR <br /> PEA PURGE (D T W) (c;pm .PM (uwts) ([MMKOS) (Cd--) (1mvolts) (PP'�I) (N T U) <br /> 1720 0 N/A 5 GPM 744 1547 205 -5 N/A BROWN <br /> 1722 1 746 1566 208 -16 LT BRN <br /> 1724 2 747 1565 209 -14 ' <br />' 1726 3 745 1563 21 -8 CLEAR <br /> PURGE METHOD CENTRIFUGAL PUMP <br /> SAMPLE METHOD 1 STAINLESS STEEL BAMER <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 1039 <br /> WELL INTEGRITY CAP&SEAL ARE SECURE AMERICAN LOCK IS INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS GOOD RECHARGE <br /> WEATHER CLEAR WIND NW10 <br /> QUALITY CONTROL ALL PURGING EQUIPMENTAND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITHA STE9MCLEANER&ALCONOX SOAP NEW VIIRILE GLOVES <br />' CONTAINMENT D O T 1755 GAL STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION Y S.I 3560 FLOWCELL Y S L DISSOLVED OXYGEN TER <br /> SOLIKIST SLOPE METER THERMODI EE 580B P I D <br /> K=INTERFACE METER TURBIDITY METER <br /> • <br />