Laserfiche WebLink
Cjeotogua(Technus Inc Page 6 <br />' Groundwatei Monitoring Report <br /> Project No 425 2 <br /> January 12, 2001 <br /> 1 Recommendations <br /> The following recommendations are made <br /> I The 12 monitoring wells and 3 domestic wells should be sampled for natural attenuation <br /> parameters during future monitoring events so it may be determined if remediation by <br /> natural attenuation is occurring <br />' 2 Additional decontamination procedures should be implemented to insure that the sample <br /> ports of the domestic wells are cleaned prior to sample collection Instructions will be <br /> given to the field technician for decon procedures <br /> t3 The high concentration of contaminants at the source should be removed to provide <br /> protection to surrounding water wells, facility natural attenuation, and to achieve <br /> closure A work plan to achieve this goal has been submitted to and approved by SJC <br /> PHS/EHD for implementation The work will be accomplished after USTCFP cost pre- <br /> approval is obtained <br /> 4.0 LIMITATIONS <br /> This report was prepared in accordance with the accepted standards and practices of the <br /> field of environmental geology, groundwater hydrology and good business practices It <br /> should be recognized that definition and evaluation of environmental conditions is a <br /> difficult and inexact science Judgments leading to conclusions and recommendations are <br /> generally made with an incomplete knowledge of the site--specific conditions present <br />' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br />' made <br /> 1 <br /> 1 <br />