Laserfiche WebLink
4.0 SIGNATURES AND CERTIFICATIONS <br /> This workplan was prepared by Del-Tech Geological Support and Geological Technics <br /> The work proposed herein will be performed in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this project <br /> This proposed workplan was prepared by Donald E Light <br /> Dol 1 E Ligh <br /> California Engineering Contractor # 657366 1 Hazardous Waste Endorsed <br /> This proposed workplan was supervised and reviewed by Ray Kablanow,PhD, R G <br /> Qa°FESS10 <br /> R1 11In <br /> �r0 <br /> ro sz3a <br /> Ray Kablanow PhD, R G <br /> 'SOF�It& <br /> 7 <br />