Laserfiche WebLink
SENT BY:Xerox Telecopier 7C2' 4- 3-92 ; 3:54PM ;# 3 <br /> is conditional for uncontrolled aeration of soil with 50 ppm of <br /> TPH or less ; any soil with TPH in excess of 50 ppm must be ad- <br /> dressed separately. This invitation for bid has been prepared so <br /> that Ruiz Grocery remains in compliance with the new underground <br /> storage tank regulations adopted on December 2, 1991, by the <br /> State Water Resource Control Board. <br /> C. Scope of Work <br /> Cleanup Methods - The consultants, RE5NA Industries, Inc. ( for- <br /> merly WaterWork) and Delta Environmental Consultants, 'Inc. , who <br /> conducted site investigations have recommended that soil in the <br /> previously existing tank locations be excavated to a depth of it <br /> feet and aerated on site. Further, a letter from the LRA has <br /> requested Ruiz Grocery to further define the plume of the hydro- <br /> carbons in the groundwater. Finally, quarterly sampling and <br /> testing of groundwater elevations, and reports of such informa- <br /> tion should be included. <br /> Consultants may bid on the above method, or propose another <br /> cleanup method that is considered to be more cost efficient. New <br /> technologies are encouraged, but a pilot test which proves the <br /> viability of whatever method is proposed, must be conducted prior <br /> to implementation of the full scale program. <br /> Ideally, bids will include an evaluation and comparison of sever- <br /> al feasible cleanup methods for the site, as well as a clear <br /> explanation for choosing the proposed method. <br /> Tasks - Bids shall include the projected total cost of cleanup as <br /> well as the unit costs involved in completing the following <br /> tasks <br /> 1. Preparation of a detailed CAP to send to the LRA for review; <br /> 2 , obtaining the permits required from governmental agencies to <br /> execute the proposed work plan; <br /> 3. implementation of a pilot study to test the viability of the <br /> proposed cleanup method; <br /> 4 . Purchase (or lease) of required equipment, and materials <br /> (minor items such as sampling equipment and materials can be <br /> lumped together under pne category) , and construction of any <br /> structures, excavations, lined ponds , etc. ) ; <br /> 5 . Equipment operation and maintenance (per month) ; <br /> 6 . Periodic sampling (and reporting) of soil and groundwater to <br /> check cleanup progress (per sampling interval) in accordance <br /> with PHS/EHD guidelines; and <br /> 7 . Verification sampling (past-closure monitoring) of groundwa- <br /> ter (per sampling interval) in accordance with FHS/EHD <br /> guidelines; <br /> -2- a02733.NTC/TXMn/W? <br /> 76158-18437/ai[H/04/03/gZ/3 <br />