My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:12:28 PM
Creation date
7/3/2019 4:20:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 09 '95 04:02PM CLEARWATER GROLP <br /> CLEARWATER <br /> C: k a U P, 1 N C. <br /> Clearwater also recommends that slug tests be completed using selected monitoring <br /> wells, and that the existing;water supply well be considered for use in an abbreviated <br /> pumping/recovery test, provided this .well is completed within a relevant <br /> subsurface unit. The water well test will be considered only•after reviewing the well <br /> completion records or otherwise establishing the well completion depth/screened <br /> interval. <br /> The modifications presented above should not require a siVificantly greater <br /> commitment of financial resources, though it is recommended that the change in <br /> budget be pre:-approved by the U'STCP, in.order to ensure adequate reimbursement. <br /> A request for pre-approval will be submitted to Mx. George Lockwood followi�tg <br /> your approval of this change in scope. It is anticipated that Mr. Lockwood will <br /> require approximately one week to review and comment/approve. Testing can <br /> commence within.two weeks of receipt of ire-approval (due to scheduling IC engine <br /> rental, etc.), <br /> I <br /> Thank you for your continued assistance with this project. I look forward to <br /> speaking with you again soon. <br /> Regards, <br /> Clearwater Group,Inc. <br /> Mark B. Niebanck, R. G. <br /> operations Manager <br /> cc. Ms. Brooke Birkie, Neumiller Beardslee <br /> Ms. Stella Ruiz <br />
The URL can be used to link to this page
Your browser does not support the video tag.