My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006431
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
ARCHIVED REPORTS XR0006431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:41:43 PM
Creation date
7/3/2019 4:38:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006431
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br /> . G R O U P, I N C <br /> All wells will be surveyed to the north side of the top of casing for elevations <br /> to the nearest ±0 01 foot Elevations will be referenced either to mean sea <br /> level or to a project datum A project datum is typically chosen for its <br /> location such that it will remail unchanged in the event of site construction <br /> or other site disturbances Where required, the wells will be surveyed by a <br /> licensed land surveyor, relative to the nearest benchmark <br /> Well Development <br />' All newly installed wells will be developed prior to sampling to remove fine <br /> grained sediments from the well and stabilize the filter pack and the disturbed <br /> aquifer materials Well development will consist of surging with a surge <br /> block and removing water from the well with either a pump or bailer, until <br /> the well is free of sediment, or after 10 well casing volumes have been <br /> removed Where appropriate, temperature, pH, specific conductance and <br /> turbidity will be monitored during well development All development <br /> equipment will be cleaned prior to use and between wells with an Alconox <br /> solution, then rinsed in clean water All data collected during development <br /> will be presented on the well development data sheet <br /> Ground Water Sampling <br /> Prior to the start of work, a decontamination area will be established. This <br /> will be in a secured area and consist of an Alconox solution wash, a first rinse <br /> and a second rinse Any down hole equipment will be decontaminated prior <br /> to use <br /> Prior to purging and sampling any well, the static water level will be <br /> measured with an electronic water sounder or an oil/water interface probe to <br />' the nearest ±0 01 foot If floating product is detected, interface probe results <br /> will be confirmed by lowering a clear disposable polyethylene bailer down the <br /> well and measuring the product thickness to the nearest ±0 01 foot, in the <br /> bailer Any monitoring well containing detectable amounts of floating <br /> product will not be purged or sampled Field observations such as well <br /> integrity as well as water level measurements and floating product <br /> thicknesses will be noted on the gauging data/purge calculations form. <br /> All monitoring wells to be sampled shall be purged using either a PVC bailer <br /> or a submersible pump Physical parameters (pH, temperature and <br /> conductivity) of the purge water will be monitored for stabilization during <br /> CLEARWATER GROUP,INC 3 December 16, 1994 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.