Laserfiche WebLink
CLEARWATER <br /> . G R O U P, I N C <br /> All wells will be surveyed to the north side of the top of casing for elevations <br /> to the nearest ±0 01 foot Elevations will be referenced either to mean sea <br /> level or to a project datum A project datum is typically chosen for its <br /> location such that it will remail unchanged in the event of site construction <br /> or other site disturbances Where required, the wells will be surveyed by a <br /> licensed land surveyor, relative to the nearest benchmark <br /> Well Development <br />' All newly installed wells will be developed prior to sampling to remove fine <br /> grained sediments from the well and stabilize the filter pack and the disturbed <br /> aquifer materials Well development will consist of surging with a surge <br /> block and removing water from the well with either a pump or bailer, until <br /> the well is free of sediment, or after 10 well casing volumes have been <br /> removed Where appropriate, temperature, pH, specific conductance and <br /> turbidity will be monitored during well development All development <br /> equipment will be cleaned prior to use and between wells with an Alconox <br /> solution, then rinsed in clean water All data collected during development <br /> will be presented on the well development data sheet <br /> Ground Water Sampling <br /> Prior to the start of work, a decontamination area will be established. This <br /> will be in a secured area and consist of an Alconox solution wash, a first rinse <br /> and a second rinse Any down hole equipment will be decontaminated prior <br /> to use <br /> Prior to purging and sampling any well, the static water level will be <br /> measured with an electronic water sounder or an oil/water interface probe to <br />' the nearest ±0 01 foot If floating product is detected, interface probe results <br /> will be confirmed by lowering a clear disposable polyethylene bailer down the <br /> well and measuring the product thickness to the nearest ±0 01 foot, in the <br /> bailer Any monitoring well containing detectable amounts of floating <br /> product will not be purged or sampled Field observations such as well <br /> integrity as well as water level measurements and floating product <br /> thicknesses will be noted on the gauging data/purge calculations form. <br /> All monitoring wells to be sampled shall be purged using either a PVC bailer <br /> or a submersible pump Physical parameters (pH, temperature and <br /> conductivity) of the purge water will be monitored for stabilization during <br /> CLEARWATER GROUP,INC 3 December 16, 1994 <br /> 1 <br />