Laserfiche WebLink
INTERIM REMEDIAL ACTION PLAN <br /> 4491 West Durham Ferry Road <br /> Tracy, California <br /> Delta Project No 40-91-732 <br />' Page 12 <br />' TABLE 5 <br /> FUTURE WORK SCHEDULE - PHASE I <br />' Task by order Approximate Date of Com letion <br /> e SVE Well Work Plan and Procurement of Apnl 1993 <br /> Permits <br /> e SVE Well Installation October 1993 <br />' e Prepare SVB Test Work Pian and Obtain SVE TBA <br /> Test Permit <br /> n Conduct SVE test TBA <br />' e SVE System Design/Plan Preparation TBA <br /> IN Procurement of SVE System Permits TBA <br /> ' n Prepare Bid Package TBA <br /> IN Select Contractor TBA <br /> e Install and operate intenm SVE system TBA <br /> e Additional ground water momtonng well TBA <br /> Installation Work Plan and Procurement of <br /> Permits <br /> n Additional Ground Water Monitoring Well TBA <br /> ' Installation <br /> n Prepare Problem Assessment Report TBA <br /> e Prepare Final Remediation Plan TBA <br /> ' TBA = To be arranged <br /> ' RPT045 TA <br />