Laserfiche WebLink
1�� ATC PropO5aI N0. 054-2019-0054 <br /> 1 July 10,2019 <br /> Page 2 of 2 <br /> After ATC'a Initial review,the client will he provided with a IIsi of any additional Information needed for Inclusion In the SPCC Plan and <br /> identify any container or facility deficiencies (operational, engineering and/or otherwise)that must be corrected to satisfy the <br /> requirements of 40 CFR Part 112.The client will then be offered the opportunity to use its own resources to called and supply the <br /> required information,and correct am.all,or none of identified defciencies. <br /> Once all the required information is collected and any deficiencies are darrected,ATC wII produce a draft version of the Plan for client <br /> review and comment. After any comments are addressed,one(1)electrons,copy of the final codified SPCC Plan cerMgd by a <br /> California P.E.will be delivered to the client In the event that a specified corrective action cannot immediately be completed,the P.E. <br /> may issue an SPCC but cert the SPCC Plan under the conditional requirement that the corrective adion(;)be completed by a <br /> specified data <br /> SUPPLEMENTAL SERVICES <br /> Due to wide variance In equipment ouUMing and how regulations are enforced,the folkrwing services will be provided on a time and <br /> material basis at a rate d$85 per hour: <br /> • Responses to unwarranted or unreasonable regulator challenges, <br /> . Employee Training. <br /> EXCLUSIONS' <br /> The following outside professional services may be required for completion of the SPCC but are rot icoludnd In this estimate. <br /> • Recovery of obscured or missing AST specification Information as,required in the SPCC, <br /> • Determining howa AST Is equipped or pugged,beyond whet is visually obvious, <br /> • A determination of suitability of service ofall AST;or his appurtenances, <br /> • Engineering and modifications needed for appraisers, piping or other conveyance equipment or structures that may be <br /> necessary in order for the facility to comply with the requirements d40 CFR Pad 112, <br /> • Required Certified AST Inspectioro or Testing. <br /> ATC a unable to provide these serv'ees. Should one or more of the above provffional;ervs,es be required,ATC wall provide a referral <br /> to a company qualifad to provide those services. <br /> COMPENSATION <br /> ATC wall prepare an SPCC denied by a California Professional Engineer for the facility for a lump sum of$3,500.This estimate <br /> assumes two material storage areas and fire bulk oil containers. <br /> AUTHORIZATION <br /> Please execute and return a copy of the afteched;ervs,e oder and Client Services Agreement to autndrba the work. The term;and <br /> conditions of the agreement shall apply to all work Performed relative to this proposal. <br /> Thank you for the opportunity to present this proposal and looks forward to working with you on this pideet. If you have any <br /> questions or require(umber information,please email or call the undersigned at(209)579-2221. <br /> Slncorely, <br /> ATC Group Services LLC <br /> ��'0"LL 5- <br /> Mike Spoke Jeanne Homsey <br /> Project Manager Branch Manager <br /> ATC Group Servide;LLC ATC Group Servide;LLC <br /> email:mike.sonke�atc�s.com email:�wLn,� L.ndms, ee�atdLs.dom <br /> Aftchmnh;: Client Service Agreement <br /> Service Oder <br /> smnise—s.mm.—isk.marm®.miw+req.."is-1,sram.mnwnavemmnisr— urxre.. <br />