Laserfiche WebLink
APPENDIX A-3: SAMPLE FORM FOR , INSPECTION <br /> Go to wwwpei.orgIRP900 for an electronic version of this form. <br /> ID#: ANNUAL TRANSITION SUMP INSPECTION CHECKLIST Date: <br /> Category IDescription PomP900 N/A Tank t Tank 2 Tank 3 Tank <br /> Transition Sump 8.6 <br /> Any water or product removed and disposed of properly 8.6.4 <br /> Visible piping and fittings show no signs of leaking 8.6.1 <br /> Piping in good condition 8.6.2 <br /> Sump free of trash and debris 8.6.5 <br /> Sump is free of cracks,holes, bulges,or other defects 8.6.6 <br /> Penetration fittings intact and secured 8.6.7 <br /> Transition Sump Junction box(es)have covers, not corroded;conduit and intrinsically safe wiring in good condition 8.6.8 <br /> Flexible connectors not frayed,twisted,kinked or bent beyond manufacturer specifications 8.6.9 <br /> Piping interstitial space open to the transition sump (open double-walled piping system only) 8.6.20 <br /> Piping interstitial space closed to the transition sump(closed double-walled piping system only) 8.6.22 <br /> Sump lid, gasket and seals present and in good condition 8.6.23 <br /> Manhole cover at grade in good condition,does not touch sump cover,all bolts present, 8.6.24 <br /> handles and lift mechanism in good condition(as applicable) <br /> Single-Walled Single-walled sump tested for integrity every 3 years <br /> Transition Sump TEST DATE: 8.8.18 <br /> Double Walled If not continuously monitored or inspected annually,double-walled TEST DATE: 8.6.19 <br /> Transition Sump sump tightness tested every 3 years <br /> DESCRIBE ANY DEFICIENCIES HERE: <br /> PEI RP 900 Annual Transition Sump Inspection Checklist Page of <br />