Laserfiche WebLink
r <br /> 77 <br /> J. MM <br /> H. KLEINFELDER &ASSOCIATES <br /> File: 24--2045-2/29:795 <br /> December 31, 1986 <br /> Page 4 <br /> o A two-foot bentonite plug will be placed above the sand pack to <br /> provide a seal against surface water infiltration. <br /> o The remaining annular space will be filled with cement/bentonite <br /> grout to the surface. <br /> a Each well will be secured inside a cement utility box set flush <br /> to the ground surface. <br /> 3,5 Monitoring Well D v loRment and SamplingPro-cedures <br /> All three monitoring wells will be developed after installation. Each <br /> well will be first sampled with a clear acrylic bailer to visually inspect <br /> the sample for a product layer or sheen. If no product layer or sheen is <br /> observed on the water samples, the wells will be developed with a surge <br /> block/air lift development tool. Surging with the tool along the screened <br /> interval of the well will be performed to draw the sediment from the <br /> formation into and out of the well, and to set the sand pack. The <br /> sedirr2nt laden water will be air lifted from the well at a rate of <br /> - approximately 4.75 gallons per minute (gpm). Each well will be developed <br /> until the discharge water runs relatively clear of fines. Approximately 5 <br /> to 10 well •iIolumes will be removed from each monitoring well. After the <br /> wells have been developed, the formation will be allowed to stabilize for <br /> approximately one week. <br /> The depth to the static water level will be measured and then the well <br /> will be purged and sampled with a submersible pump. During the purging of <br /> the wells, field parameters (ph, conductivity, temperature) will be <br /> monitored. Samples will be collected after the field parameters have <br /> stabilized, normally requiring three to five well purge volumes. The <br /> sample bottles will be immediately sealed after collecting a,sample and <br /> placed in an iced cooler. At the end of the field day,-- the-waLcr samples <br /> will be delivered to a state/EPA certified analytical laboratory under <br /> chain-of-custody. <br /> To prevent cross-contamination, all developing and sampling equipment <br /> will be steam cleaned prior to use in each monitoring well. Additionally, <br /> a trisodium phosphate solution and clean water will be pumped through the <br /> sampling equipment prior to the collection of subsequent water samples. <br /> j&___MQ_niror!ng Well El v i n vev <br /> The relative elevations of the top of the two-inch INC casings will be <br /> --- "- -. <br /> surveyed--for.-, --- - - --the three- monitoring wells--The-casing-elevations-will-.be-- :- <br /> ---- ----- -- - --- <br /> tied into an assumed .elevation or a nearby county or USGS benchmark. <br /> Depth to the static ground water table will be measured from the top of <br /> each PVC casing. The depth to water will then be subtracted from the <br /> elevation of the top of the well casing to provide a relative water table <br /> elevation for each monitoring v:,ell location and to assess the approximate <br /> local ground water gradient direction. o <br />