Laserfiche WebLink
BONN IN11 4100 1 <br /> 0 WE <br /> nY K• <br /> -. .. 4.. F. .:.. _. .. - - <br /> R� <br /> F <br /> `ry <br /> HEALTH AND SAFETY PLANT <br /> Reeves Exxon <br /> 2350 East Street <br /> Tracy, California <br /> . INTRODUCTION <br /> PURPOSE AND SCOPE <br /> This Health and Safety Plan provides for the protection of on-site personnel and the surrounding <br /> community during site characterization activities. The requirements, specifications and <br /> procedures presented with this plan will apply to all personnel on-site including employees, sub- <br /> contractors, site visitors and regulatory agency personnel. <br /> ~ KEY PERSONNEL <br /> r The site's Safety Coordinator/Project Manager will provide training to site personnel in the use <br /> of safety and personal protection equipment and will manage the on-site monitoring program. <br /> y The Safety Coordinator/Project Manager will have the authority to deny access to any individual <br /> r- <br /> without the proper traiping or protective equipment required for the site conditions or those <br /> individuals disregarding site safety procedures. All site personnel will be under the direction <br /> of the Safety Coordinator/Project Manager. <br /> i . <br /> HAZARD ANALYSIS <br /> The property previously operated a waste oil collection system and gasoline fuel distribution <br /> E <br /> facility. Laboratory results of soil and groundwater samples collected near the former waste oil <br /> and gasoline tanks indicate the presence of diesel fuel and gasoline contamination. <br /> The activities addressed by this safety plan include drilling and subsurface soil and groundwater <br /> sample collection.. Although exposure at hazardous levels are unlikely, these activities present <br /> 3 ? QTSAFMY.WA i <br />