My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006782
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EAST
>
2360
>
3500 - Local Oversight Program
>
PR0544639
>
ARCHIVED REPORTS XR0006782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 5:01:54 PM
Creation date
7/9/2019 3:21:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006782
RECORD_ID
PR0544639
PE
3528
FACILITY_ID
FA0005076
FACILITY_NAME
DICKS EXXON
STREET_NUMBER
2360
STREET_NAME
EAST
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23346001
CURRENT_STATUS
02
SITE_LOCATION
2360 EAST ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br /> The direction of groundwater flow was determined by drawing <br /> a line perpendicular to the groundwater contours establish- <br /> ed as described Flow direction is expressed as the angle <br /> in degrees between North and the direction of groundwater <br /> flow. On March 31 , 1995 , groundwater as found to be <br /> flowing N-400 -E. <br /> The Treatment of Soil Previously Excavated at 275 Grant <br /> Line Road,_ Tracy <br /> On February 27 , 1995 , EPM submitted additional information <br /> concerning the bioremediation project proposed for 2360 <br /> East Street to PHS/EHD This information included: <br /> Copies of the original (January 11 , 1995) workplan, <br /> copies of a revised executive summary, a Statement of <br /> Qualifications prepared by Mr . Marvin Kirkeby, P. E , the <br /> registered civil engineer who will be overseeing the bio- <br /> remediation project , copies of a cross sectional view of <br /> the biotreatment bed, and copies of additional information <br /> about the bioreactor system in which EPM proposes to treat <br /> extracted groundwater that will be used to maintain <br /> bio-treatment bed moisture <br /> ENVIRONMENTAL COMPLIANCE ACTIVITIES SCHEDULED FOR THE NEXT <br /> QUARTER <br /> Approval will be sought from PHS/EHD to perform quarterly <br /> compliance monitoring at the site during the month of June, <br /> 1995 . A summary report document will be then be prepared <br /> and submitted prior to July 15 , 1995 . <br /> EPM also expects to complete the remediation of the 40 <br /> cubic yards of TOG contaminated soil excavated at 275 Grant <br /> Line Road , the treatment of well purge water stored on <br /> site, and the plume assessment activities described on Page <br /> 12 of EPM' s July 11 , 1994 Quarterly Summary Report <br /> _SSrCti <br /> John E. Rapp, EHS �, '�A D KIR C� <br /> Manager of Field Services �► <br /> No.14001 0 A <br /> FXP. z <br /> Marvin DrkekPC!V'4 44043- �o <br /> Registered civil Engineer �O�CP`�'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.