My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2300
>
2900 - Site Mitigation Program
>
PR0506195
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 6:06:06 PM
Creation date
7/9/2019 3:55:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506195
PE
2951
FACILITY_ID
FA0007266
FACILITY_NAME
PACIFIC BELL
STREET_NUMBER
2300
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
2300 EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regional Office <br /> INTERNATIONAL 4585 Pacheco Boulevard <br /> TECHNOLOGY Martinez,California 94553-2233 <br /> CORPORATION 510-372-9100 <br /> Fax:510-372.5220 <br /> July 9, 1996 <br /> IT Project No. 765748 <br /> Mr. Harlan Knoll <br /> San Joaquin County Public Health Services <br /> Environmental Health,Division <br /> P.O.Box 338 <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, CA 95201 <br /> Underground Storage Tank Replacement Project <br /> Pacific Bell Facility <br /> 2300 E. Eight Mile Road; Stockton CA <br /> Dear Mr. Knoll: <br /> IT Corporation was contracted by. Pacific Bell to provide environmental,consulting services <br /> during the removal of two underground storage tanks (4,000 and 10,000 gallon capacity) from <br /> their above referenced facility. The tanks were removed .by representatives of Aronson <br /> Engineering in May, 1996. Aronson additionally replaced the removed tanks with one new <br /> 15,000 gallon, compartmentalized tank. The attached report details -the procedures used and. <br /> analytical results obtained during the execution of the tank replacement project. If you have any <br /> questions or comments lease feel free to contact Q , p meat: (510) 372-5292. <br /> Sincerely, <br /> Sydney Geels <br /> Project Manager <br /> CC: Nancy Clancy - Pacific Bell <br /> Tom Chilcote - Pacific Bell <br /> Letitia Briggs - San Joaquin County <br /> Steve Dalton - San Joaquin Fire <br /> IT Corporation is a who➢y owned subsfdlary of International.Technology Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.