Laserfiche WebLink
Valley Pacific Petroleum Services Stockton,CA <br /> Spill Prevention,Control,and Countermeasure Plan <br /> A Changed Conditions and Limitations <br /> The findings of this report are valid as of the date of this report. However, if there are any changes <br /> to the existing facility, including management of oil transference, expansion, new improvements, <br /> and/or operations, the Facility Manager will notify a Registered Civil Engineer to review the <br /> change(s) at the facility to determine if calculations for this report are still applicable. If the change <br /> alters the SPCC Plan for the facility, then the law requires an amendment to this SPCC Plan. <br /> The validity of the analysis contained in this report is dependent upon the prescribed inspections, <br /> observations, and analysis program specified by 4Creeks, Inc. during the operation of the facility. <br /> Any recommendations in the report shall be reviewed and observed using the same program. Our <br /> firm assumes no responsibility for the compliance of the recommendations with these design <br /> concepts unless Valley Pacific Petroleum Services retains us to perform the observation and <br /> review during the installation and operation of any recommended items. <br /> 4Creeks, Inc. has prepared this report for the exclusive use of the said client. The report has been <br /> prepared in accordance with generally accepted practices of engineering. The professional advice <br /> provided in this report makes no other warranties, either expressed or implied. <br /> 015 <br />